Choke Manifold equipment

Choke Manifold equipment

Nanjing, China
Production capacity:
30 Set / Month
Nanjing, China
Anonymous
86-25-84676361
Li Liang Gen
Contact person

Basic Information

Place of Origin Zhejiang China (Mainland)
Brand Name Chance Door
Model Number CDCM
Condition used
1. ApplicationChoke manifold is necessarydevice to control the well kick successfully and execute the pressure control technology on oil/gas well in the course of drilling, as it is, the device is adopted to execute new drilling-wells technique of balance pressure, which can avoid pollution of oil-layer, improve the speed of drilling and control blowout effectively. One end of the device connects with the side flange of BOP spool. When BOP closes, it can control the finite pressure from casing by adjusting the choke valves opening, so balanced drilling can work under minimum pressure-difference.2. ConfigurationThe choke manifold consists of choke valves, gate valves, line pipes, fittings, pressure gauges and other components.3. Working PrinciplesWhen the pressure inside the well rises, opening/closing the choke valves (including manual chokes, hydraulic chokes and positive chokes) on the choke manifold can allow the release of the fluid inside the well so as to control casing pressure, which can be directly blown out through the gate valve if the casing pressure is quite high.4. Pressure RatingsThe kill manifold is available in pressure ratings of 14MPa, 21MPa, 35MPa, 70MPa and 105MPa, and also can be available upon customer request.5. Operating Instructions(1) The working pressure of all components on the choke manifold shall be compatible with that of the BOP stack used.(2) The choke manifold shall be installed at the place where the operator can reach it easily. The pressure test must be performed prior to installation and the seat test pressure shall be equal to the rated working pressure.(3) The line pipe shall be level and straight as much as it could. In case of the turn of the line pipe, the 120 degree steel bent pipe shall be used. The bore of the line pipe shall be large enough.(4) The pressure gauge must be installed.(5) In winter, the choke manifold can work under a low temperature condition.Parts List:ItemComponentQtyMaterial1Skid Base12Hydraulic Choke13Five-way Piece141304Gate Valve15Pressure Gauge16Needle Valve17Instrument Flange141308Gate Valve109Spacer Spool210Studded Cross5413011Blind Flange7413012Spacer Spool113Gate Valve214Manual Choke2

Delivery terms and packaging

Packaging Detail: by buyer Delivery Detail: in 45 days - 60 days after order
Port: Shanghai

Payment term

Letter of credit

Telegraphic transfer

Фотографии

    Password recovery
    To recover your password, please enter in the box below your email address with which you have registered:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    An error has occurred. Please check your e-mail address and try again.
    Ваш новый пароль:

    Name is empty


    Выберите страну доставки

    You have not written a message

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    Your message has been sent!

    Close

    1
    Рынок B2B
    Cancel Close
      Show more close
        Area search
        Worldwide
        Категории
          Product