walk thru frame scaffolding

walk thru frame scaffolding

Qingdao, China
Qingdao, China
Company
0086-532-88202329
Bonnie HUANG
Contact person

Basic Information

Place of Origin Shandong China (Mainland)
Brand Name PUDE
Model Number WT
walk through frame scaffolding Item:1219*1524,1219*1700,1219*1930 and so on Data: 42.7*2.3mm lock:fliplock Surface: HDG,EG,paint, electrophoretic paint components of assembling 1.Main frame Insert the main frame into jack base section in per pendicular position 2cross brace for fixing the main frame in each span of scaffolding 3.Joint pin insert into the top of main frame for joining the required dimension 4.Horizontal frame or catwalk It is a lateral pipe frames used for fixing the main frame to complete the first floor scaffolding.it can be erected with about 2 to 4 spans in each high rision floor alternately. 5.jack base It is a base seat for adjusting and fixing the required scaffolding length above the wooden planks.

Delivery terms and packaging

Packaging Detail: standard packing Delivery Detail: within 30 days after your order
Port: Qingdao Port

Payment term

Letter of credit

Telegraphic transfer

Фотографии

    Password recovery
    To recover your password, please enter in the box below your email address with which you have registered:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    An error has occurred. Please check your e-mail address and try again.
    Ваш новый пароль:

    Name is empty


    Выберите страну доставки

    You have not written a message

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    Your message has been sent!

    Close

    1
    Рынок B2B
    Cancel Close
      Show more close
        Area search
        Worldwide
        Категории
          Product