Upholstery material paint coating line

Upholstery material paint coating line

Zhangjiagang, China
Production capacity:
300 Set / Year
Zhangjiagang, China
Company
0086-512-56793873
Iris Wong
Contact person

Basic Information

Upholstery materialpaint coating line 1. Pre-treatment To remove the impurity on the object that needs to be painted, such as oxide, rust, grease, etc, to provide a good substrate for spray painting, it adopts the processing of phosphorization, oxidation, passivation to ensure the coating has the properties of antisepsis and decoration. The pre-treatment includes Spray type, tank-dip type, skin-diving Major component Shed body, tank, exhaust systems, pumps and sprinkler system, air supply system, hanging chain protection, water separation equipment, heat exchange system, slag removal system, pickling systems, pure water generation system, temperature control system, electronic control system and other system. 2. Spray painting Through the spray gun or disc atomizer, by means of pressure or centrifugal force, dispersed into uniform and fine droplets, painting on surface of objects that need to be coating. It can be divided into air spray, airless spray, electrostatic spray coating, and the basic form of various derived methods, such as a large flow of low pressure spray coating, thermal spraying, automatic spraying, and multiple spray. Spray operation with high efficiency, suitable for manual and industrial automation and wide application. Mainly used for metals, plastics, furniture, military, marine and other areas. This technique is currently the most common application of a coating method. Spraying operations require environmental requirements for clean room of million to hundred level. Spraying equipment includes spray gun, spray booth for paint room, drying room, spraying equipment, the workpiece transport operations, anti-fogging and wastewater, waste gas treatment equipment. Kind of coating material-Oil coating, lacquer coating, powder coating, UV oil coating. Kind of spray booth 1) Dry spray booth- for small quantities and more complex parts 2) Atomizing-type spray chamber-for small parts 3) Water curtain spray chamber- for the medium-sized parts 4) Rotating water spray room- large decorative pieces, a higher degree of accuracy. Major structure of spray booth 1) Room Structure- The role is very limited, the paint mist within a certain range. 2) Mist filter-sub-types of dry and wet. Dry-Mist filter paper in the baffle or infiltration. Wet-the water in the gas mixture, separation of mist particles from the air (wet room rather than the more environmentally friendly dry conditions point) 3) Water supply systems-ensuring the necessary room for the normal cycle of spray water. 4) The ventilation systems- from gas, exhaust composition, equipment has a certain temperature, humidity and air cleanliness, to ensure that indoor air laminar flow conditions. 5) Lighting-to ensure good lighting. 3. Stoving As the heavy construction machinery and parts machine, heat capacity, so it’s anti-rustcoating drying, generally uniform baking hot air convection drying method. Heat source can be local conditions, use of steam, electricity, light diesel oil, natural gas and liquefied petroleum gas. Divided into hanging air furnace, tunnel furnace, oven cabinet. Major component 1) Drying room- to cycle hot air does not spill, so that the indoor temperature is kept within a certain range 2) The heating system-a radiation heating and convection heating to ensure the indoor air temperature in the range of technological requirements 3) Duct-Guide the hot air circulating in the drying room, the heat to the workpiece 4) Air filter- filter dust in the air 5) Air heater; heated indoor air circulation 6) Fan- Forced hot air circulation drying room 7) Air curtain system- to prevent the hot air to leak out, to improve thermal efficiency 8) Temperature control system-to ensure that indoor temperature of each device to process requirements

Delivery terms and packaging

Packaging Detail: Wood Composite Panel Delivery Detail: About 30 days
Port: Shanghai

Payment term

Letter of credit

Telegraphic transfer

Фотографии

    Password recovery
    To recover your password, please enter in the box below your email address with which you have registered:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    An error has occurred. Please check your e-mail address and try again.
    Ваш новый пароль:

    Name is empty


    Выберите страну доставки

    You have not written a message

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    Your message has been sent!

    Close

    1
    Рынок B2B
    Cancel Close
      Show more close
        Area search
        Worldwide
        Категории
          Product