two floor morden luxury steel villa for 380 sqm D

two floor morden luxury steel villa for 380 sqm D

original price: 250,00 USD
Beijing, China
Production capacity:
120 Unit / Month
Beijing, China
Company
86-10-59648767
13910517275
Minglang Xu
Contact person

Basic Information

Place of Origin Beijing China (Mainland)
Brand Name dekree
Model Number DT201
steel Villa Specifications Life span: more than 70yearsHigh seismic performance-----maximum protection more than 8 scalesWind-proof----- can safety face maximum typhoon of 70 meters per secondFire resistance-----duration about 4 hours depends on different design.Snow resistance-----a maximum snow load of 2.9KN/M2 as requiredHigh water and heat insulation----100 mm in thickness can match that of brick wall more than 1m thickness.High acoustic insulation----- 60db of exterior wall 40db of interior wallinsect prevention: free from the damages by the inspects, such as white ants, and so onVentilation-----a combination of natural ventilation & air supply keep the indoor air fresh and cleanVilla materials(1)Steel Structuregalvanized steel frames: 0.8-2mm thickness light steel gauge(2)FlooringA. Prefabricated Deck panels+ cement+ steel barorB. light steel gauge frame +OSB board(3)Foundation connectionReinforced concrete + Standard embedded anchor bolts whole or strip are all ok(4)Windows and DoorsWindows: Double glazing plastic-steel or aluminum alloy thermo-insulating framesDoors: steel security gate doors; wood or molded doors(5)Composite Wall System (thickness:150-250mm)Plaster board + steel framces + glass wool + OSB board + anti-moisture foil + foam insulation board + facing decorations----Facing decorations materials: A. Cement fiber board B. Metal embossing composite insulation panel C. PVC wall panel D. Stucco E. Artificial stone F. Paint(6)Roofing Systemroofing tile + SBS waterproof sheet + Fiber cement board (OSB board) + roof joist + rainspout----roofing tiles1. Asphalt tile2. Cement tile3. Clay tile4. Color steel tile5. Glass fiber tilePacking and delivery:one 40’HQ container can load all the materials for about 200 square metersInstallation: it takes 10 workers 30-45 days to install a villa for 250 square meters.Projects: Australia,Kazakhstan,Mongolia,Ukraine,Middle East,Chile,Sudan, England, ect.

Delivery terms and packaging

Packaging Detail: packed in bundles Delivery Detail: 30 days
Port: tianjin

Payment term

Letter of credit

Telegraphic transfer

Фотографии

    Password recovery
    To recover your password, please enter in the box below your email address with which you have registered:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    An error has occurred. Please check your e-mail address and try again.
    Ваш новый пароль:

    Name is empty


    Выберите страну доставки

    You have not written a message

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    Your message has been sent!

    Close

    1
    Рынок B2B
    Cancel Close
      Show more close
        Area search
        Worldwide
        Категории
          Product