suspended ceiling t bar

suspended ceiling t bar

original price: 0,50 USD
Linyi, China
Linyi, China
Company
86-539-8155598
Sunshan Meng
Contact person

Basic Information

Material Steel
Place of Origin Shandong China (Mainland)
Brand Name julong
Model Number 38*24*3600*0.3mm
1.) Flat ceiling T-bar 38# 32# Size: height:32mm 38mm Thickness:0.3mm 0.27mm Wideth:24mm 22mm Length:3600mm 1200mm 600mm and so on. Raw materials:high-quality hot-dipped galvanized steel coil The length and thickness can be produced on customer's request 2.)middle groove line tee grid: 38# 32# Size: height:32mm 38mm Thickness:0.3mm 0.27mm Wideth:24mm 22mm Length:3600mm 1200mm 600mm and so on. Raw materials:high-quality hot-dipped galvanized steel coil The length and thickness can be produced on customer's request. 3.)groove t grid: Model No.: 32# Size: Height:32mm Wideth:24mm 22mm Thickness:0.27mm 0.3mm Wideth:24mm The length:3600mm 1200mm 600mm and so on The secification can be required by the customer. It is used in the hotel,home,bus station,suppermarket,and office building and etc. The detail information of the ceiling tee grid (T-Bar, T-grid) 1.) Be made of hot dip galvanized steel .it is fire tightness , flame retarded,soundproof,anti-aging 2.) The connector by unique design,when you construct the ceiling, it is easy to install and not to be losened or to be detached each part.. 3.) It is also can be removed and reused without being damaged or without the use of tools. 4.) Its suspension holes punched on the main tee and cross tee in order to increase the durability and safety of the lay-in grid suspended ceiling system. Installation steps: 1.) Determine the requirment ceiling level,mark the position and fix wall angle on the wall. 2.) Hang main tee with T-bar suspension hook. 3.) Insert cross tee to the main tee. 4.) Cross tee adjacent to wall angle light fittings 5.) Adjust the levels and alignments throughout the entire grid system accurately 6.) Install PVC gypsum ceiling tile or othermaterials ceiling panel.

Delivery terms and packaging

Packaging Detail: suitable and protective for seaworthy Delivery Detail: seven days after receiving 30% deposit
Port: qingdao

Payment term

Letter of credit

Telegraphic transfer

Фотографии

    Password recovery
    To recover your password, please enter in the box below your email address with which you have registered:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    An error has occurred. Please check your e-mail address and try again.
    Ваш новый пароль:

    Name is empty


    Выберите страну доставки

    You have not written a message

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    Your message has been sent!

    Close

    1
    Рынок B2B
    Cancel Close
      Show more close
        Area search
        Worldwide
        Категории
          Product