spray booth (YS-70)

spray booth (YS-70)

Guangzhou, China
Production capacity:
3 Set / Day
Guangzhou, China
Company
86-20-87468668
Yodan Cai
Contact person

Basic Information

Specification for Spray Booth YS-70 8000×4500×3000 mmL×W×H 8000×4500×3000mmL×W×H Outside dimension 8100×6350×4000 mmL×W×H 8100×6350×4000mmL×W×H Main door Folding door, 4 folds, 3500×2900 mmW×H, made by bending steel without cover frame, colour : blue. Escape door 1 unit, 800×2000mm W×H, colour: white. Basement Galvanized steel assemble, 350mm high, with adjustable bolts, quadrate steel support, 5 rows of grilles made by flat bar and twisted steel, then galvanized. 4 ramps, external setting, 900×2500mm/pc. Wall Panels Thickness: 50mm, width:1000mm, tongue and groove structure, 0.476mm colour steel with 50mm thick polystyrene (PU) insulation inside, colour: white. Lighting Ceiling Lights: 10Units×4Pcs=40Pcs×36W, with electronic ballasts, lighting boxes are powered coated. Side Lights: 14Units×4Pcs=56Pcs×36W, vertically set, with electronic ballasts, vertically set, lighting boxes are powered coated. Generator setting Intake air from back upper direction, exhaust air from back upper direction galvanized steel molding frame; white coated steel outside, galvanized steel inside, filled with heat preservation material in the middle. Intake and Exhaust air system 2×4KW double-intake centrifugal fans for intake air, motor outside, belt- drive, air capacity for each fan: 30000m3/h 1×7.5KW double-intake centrifugal fan for exhaust air, motor outside, belt drive, air capacity: 22500m3/h. Heating system RIELLO RL28diesel burner, stainless steel heat exchanger, electric damper actuates from spraying to baking cycle. Max. heating productivity: 28000kcal/h. Filtering system Pre-filter, ceiling filter, fibreglass filter, activated carbon filter Roof Plates Galvanized steel Control system Power supply switch, emergency stop, fire safety valve, PLC combined with HMI control, inverters for motors. Note This model has waterborne paint system

Delivery terms and packaging

Packaging Detail: 20'GP can load 1 set, 40'GP 2 sets, 40`HQ 3 sets. Delivery Detail: 15 workdays
Port: Huangpu port, Guangzhou, China

Payment term

Letter of credit

Telegraphic transfer

Фотографии

    Password recovery
    To recover your password, please enter in the box below your email address with which you have registered:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    An error has occurred. Please check your e-mail address and try again.
    Ваш новый пароль:

    Name is empty


    Выберите страну доставки

    You have not written a message

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    Your message has been sent!

    Close

    1
    Рынок B2B
    Cancel Close
      Show more close
        Area search
        Worldwide
        Категории
          Product