SF6 High Voltage Load Switch

SF6 High Voltage Load Switch

original price: 100,00 USD
Shenzhen, China
Production capacity:
1000 Set / Year
Shenzhen, China
Company
86-0755-81784915
13530371712
Ado Du
Contact person

Basic Information

Place of Origin Guangdong China (Mainland)
Brand Name XUMING
Model Number FL(R)N38-12D
Max. Current 1250A
Max. Voltage 12KV
SF6 Load Switch Genaral FL(R)N38-12 SF6 load switch is a 10KV high voltage switch equipment,which is researched and designed by ourselves,its performance meets or exceeds the country standerd.It widely used in 10KV transformer system, usually worked as the inlet and outlet main cable switch of RMU,outdoor cable distribution boxes,transformer chamber and etc. 1)Switch case is made of reinforced epoxy resin which casting under vacuum, there is 1.4 bar SF6 gas inside as insulating and arc-extinguishing material. 2)It has two fracture,three position rotating moving contact,switching-on ,opening,earthing 3)An explosion relief channel in the back,to protect operators from high temperature and high pressure 4)It is small in size,column order,easy install 5)With an able-see window,could observe working state 6)Can install barometer and pressure node 7)Secrity and stability during operation,maintenance during the life time Specification ItemsUnitParaterFLN38FLRN38rated voltageKV12rated currentA630125main circuit rated short time current/lasting timeKA/S25/2ground loop rated short time current/lasting timeKA/S20/2rated peak withstand and short circuit making currentKA/S31.5125rated loading breaking currentA630Rated closed switch-off currentA6305%rated loading breaking currentA31.5Rated cable charging currentA10rated breaking no-load transformer capacityKVA1250rated transfer breaking currentA—1700rated short circuit breaking current insulation levelKA—31.5fust link rated maximum currentA—1251min power frequency withstand voltage phase-groundKV42breaker gapKV48lightning impulse withstand voltageKV75breaker gapKV85main circuit,ground loop mechnical lifeTIMES3000/2000SF6 rated pressureMpa0.04

Delivery terms and packaging

Packaging Detail: Wooden case or according to customer's requirement Delivery Detail: 15-25 days after receipt of deposit
Port: Shenzhen

Payment term

Letter of credit

Telegraphic transfer

Фотографии

    Password recovery
    To recover your password, please enter in the box below your email address with which you have registered:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    An error has occurred. Please check your e-mail address and try again.
    Ваш новый пароль:

    Name is empty


    Выберите страну доставки

    You have not written a message

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    Your message has been sent!

    Close

    1
    Рынок B2B
    Cancel Close
      Show more close
        Area search
        Worldwide
        Категории
          Product