prefab house,steel houses,steel homes

prefab house,steel houses,steel homes

Shanghai, China
Production capacity:
5 Set / Month
Shanghai, China
Company
86-21-62031215
Claudia Dai
Contact person

Basic Information

Place of Origin China
Brand Name DL
Model Number DH W080-1
The light steel frames of this house were produced by digital controlled frame manufacturing machine. It was designed by CAD. First of all, plot the wall frames and floor beams lung skeleton, and number t The light steel frames of this house were produced by hem accordingly. Then design detailed features for every wall panel, floor truss and roof truss. Finally, connect PC with frame manufacturing machine and the machine will produce frames one by one. The production difference is only within 1mm more or less. This will improve the accuracy of installation significantly. Advantages of these houses: 1. Outer heat preservation layer with air layer will ensure excellent heat preservation. 2. Frame cavity provides pipelines for the full range of embedded space. 3. Steel frames and gypsum board will improve fireproofing 4. Thinner walls will increase usable area by 6% to 10%. 5. Walls with multi-layers composite materials will ensure good sound insulation. 6. Meet needs of large span space. 7. Roof truss space is usable, which will improve utilization of space usage. 8. Bottom of the roof truss overhang can be used as floor truss , which will reduce the costs. 9. Triangular truss provides good stability, and can be installed easily and quickly. 10. Meet requirements for pipes and lines installation. 11. Save steel and improve utilization of steel usage. 12. Design datas:Wind load:0.45kn/m2; Snow load:0.45kn/m2; Resisting seismic intensity:8; Floor living load:2.0kn/m2. 13. Life of the houses: 15 years of roof, 50 years of the frames. Other advantages: 1. Can be made according to customer's idea 2. Time saving for construction 3. No pollution during construction 4. Use non-toxic materials 5. Insulation system reduces energy consumption 6. High degree of stiffness and light weight 7. Concrete foundation 8. Earthquake and wind resistance

Delivery terms and packaging

Packaging Detail: the steel can be packed in bulk. Delivery Detail: 20-25 days before shipping time exactly

Payment term

Letter of credit

Telegraphic transfer

Western Union

Фотографии

    Password recovery
    To recover your password, please enter in the box below your email address with which you have registered:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    An error has occurred. Please check your e-mail address and try again.
    Ваш новый пароль:

    Name is empty


    Выберите страну доставки

    You have not written a message

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    Your message has been sent!

    Close

    1
    Рынок B2B
    Cancel Close
      Show more close
        Area search
        Worldwide
        Категории
          Product