PE Electro Fusion Joint for Pre-insulated pipeline

PE Electro Fusion Joint for Pre-insulated pipeline

original price: 30,00 USD
Qingdao, China
Production capacity:
3000 Piece / Week
Qingdao, China
Beginner
86-532-81936899
400-688-0532
Aiguo Wu
Contact person

Basic Information

Place of Origin Shandong China (Mainland)
Brand Name TSD
Model Number DN860*650*8mm
Polyethylene Electro Heating Fusion Tape / Sleeve/ hot meltTape Itis a kind of special-purpose pipe connection, which is made by embedding specific electric heating melt welding wire in the basis of high quality PE sheet with special technicals. Mainly used for Oil&thermal pipeline, such as Pre-insulated Pipes. Performance characteristic: good bonding strength, excellent seal, high air-tightness, no PU leak, corrosion resistant, aging resistant, and easy to operate. Electric hot melt sleeve is an emerging connect fitting in anti-corrosion and thermal insulating industries. Its largely outperforms heat-shrinkable strip in terms of aging-resistance, bonding strength, and ring stiffness, further more, it applies PU foam after melting the jacketed pipes, this process needs much less time than using a heat-shrinkable strip; therefore, electric hot melting sleeves are widely welcomed in joint coating and connecting of heat distribution pipeline and oil pipeline. Features & Benefits: Waterproof; good sealing capacity;Able to withstand axial forces initiated by axial moments of the pipe in the ground;Able to withstand radial forces and bending forces; high tensil strength;Able to withstand effects of temperature and temperature variatations.Have the same thickness of the pipeline insulation layer.Could be used as drawing pipe scope of application: DN200 DN3000mmTesting programRequired technicalTesting resultTesting methodAppearanceThe appearance of HDPE electric fusion sleeve is smooth and flat, no bubble, no split, no discolor because of decomposition; and the embessed fusion net is no disconnect and tilting.passTested by eye under the sunlight.Tensile strength≥13Mpa15.0MpaGB/T 8804.3-2003Hydraulic pressure test20°C,0.1Mpa water pressure, no damage and leakage after 1 hourpassGB/T 6111-2003Air leakage test20°C,0.1Mpa air pressure,no damage and leakage after 1 hourPassGB/T 6111-2003

Delivery terms and packaging

Packaging Detail: Standard export package Delivery Detail: Around 25 days after receiving your 30% T/T deposite
Port: Qingdao

Payment term

Letter of credit

Telegraphic transfer

Western Union

Фотографии

    Password recovery
    To recover your password, please enter in the box below your email address with which you have registered:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    An error has occurred. Please check your e-mail address and try again.
    Ваш новый пароль:

    Name is empty


    Выберите страну доставки

    You have not written a message

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    Your message has been sent!

    Close

    1
    Рынок B2B
    Cancel Close
      Show more close
        Area search
        Worldwide
        Категории
          Product