Place of Origin |
Beijing China (Mainland) |
Brand Name |
dekree |
Model Number |
AS-1 |
VillaSpecifications Life span: more than 70yearsHigh seismic performance-----maximum protection more than 8 scalesWind-proof----- can safety face maximum typhoon of 70 meters per secondFire resistance-----duration about 4 hours depends on different design.Snow resistance-----a maximum snow load of 2.9KN/M2 as requiredHigh water and heat insulation----100 mm in thickness can match that of brick wall more than 1m thickness.High acoustic insulation----- 60db of exterior wall 40db of interior wallinsect prevention: free from the damages by the inspects, such as white ants, and so onVentilation-----a combination of natural ventilation & air supply keep the indoor air fresh and cleanVilla materials(1)Steel Structuregalvanized steel frames: 0.8-2.mm thickness light steel gauge(2)FlooringA. Prefabricated Deck panels+ cement+ steel barorB. light steel gauge frame +OSB board(3)FoundationReinforced concrete + Standard embedded anchor bolts whole or strip are all ok(4)Windows and DoorsWindows:Double glazing plastic-steel or aluminum alloy thermo-insulating framesDoors:steel security gate doors;wood or molded doors(5)Composite Wall System(thickness:150-250mm)Plaster board + steel framces + glass wool + OSB board + anti-moisture foil + foam insulation board + facing decorations----Facing decorations materials: A. Cement fiber board B. Metal embossing composite insulation panel C. PVC wall panel D. Stucco E. Artificial stone F. Paint(6)Roofing Systemroofing tile + SBS waterproof sheet + Fiber cement board (OSB board) + roof joist + rainspout----roofing tiles1. Asphalt tile2. Cement tile3. Clay tile4. Color steel tile5. Glass fiber tilePacking and delivery:one 40’HQ container can load all the materials for about 200 square metersInstallation: it takes 10 workers 30-45 days to install a villa for 250 square meters.Project cases: Australia,Kazakhstan,Mongolia,Ukraine,Middle East,Chile,Sudan, England, ect.