Multi-function rear-projection TV sliding board

Multi-function rear-projection TV sliding board

original price: 100,00 USD
Jinan, China
Production capacity:
100000 Kilometer / Year
Jinan, China
Company
86-0531-85738676
wenbin bian
Contact person

Basic Information

1, the external size: 1.33 m or 1.40 m x3.8 m or 4.5 m elongated. Prominent wall height 180mm, wall thickness of a large box 1.2mm. 2, the writing surface color: dark green, matt 3, the writing surface panel board by South Korean Pohang, thickness ≥ 0.40mm, 25 layers of silk, the surface layer hardness of 9H 4, laminated high-density polystyrene moisture absorbing environment, the thickness of 20mm or more, use the seamless whole. 5, back rust galvanized sheet, hot galvanized steel sheet thickness ≥ 0.25mm, zinc Z12, technical requirements are not lower than the international GB2518-88. Smooth seamless whole. 6, the adhesive material: high-strength line with international standards of environmentally friendly adhesives, bonding to ensure a solid, non-foaming, non-volatile. 7, frame material: aluminum alloy luxury champagne electrophoresis, technical performance in line with GB/T5237-93, elegant appearance, hardness is HRC14. Concealed frame with the main chute, round muffler bearing courses, 7 cm piece slide box 8, corners material: anti-aging, anti-fatigue ABS engineering plastics, sleek design, no sharp corners, streamline curvature of not less than R3, forming a mold. 9, borders, and (LCD) whiteboard Fixed: Window sliding, fixed after the writing board, writing board can be left in front of a slide, and the (LCD one machine) supporting the use of whiteboard, you can (LCD one machine) and whiteboard push-pull switch between the blackboard, so that (the LCD one machine) to form a seamless link whiteboard and blackboard, can be locked when closed. 10, writing pad frame: The width ≥ 45mm, thickness ≥ 20mm champagne colored aluminum electrophoresis. 11, push-pull mode: U-rail side, easily move around, no noise. 12, the board protection: All writing pad with a colorless transparent protective film, torn off before use. 13, the installation requirements: Stealth install, no exposed fittings, to maintain overall stability, sturdy and beautiful.

Delivery terms and packaging

Packaging Detail: carton Delivery Detail: 15-25 days after receive 30% of payment
Port: qingdao

Payment term

Documents Against Acceptance

Documents Against Payment

Letter of credit

Telegraphic transfer

MoneyGram

Western Union

Фотографии

    Password recovery
    To recover your password, please enter in the box below your email address with which you have registered:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    An error has occurred. Please check your e-mail address and try again.
    Ваш новый пароль:

    Name is empty


    Выберите страну доставки

    You have not written a message

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    Your message has been sent!

    Close

    1
    Рынок B2B
    Cancel Close
      Show more close
        Area search
        Worldwide
        Категории
          Product