metal grandstand

metal grandstand

original price: 50,00 USD
Shanghai, China
Shanghai, China
Company
86-21-68066122
15000818789
Gily Choi
Contact person

Basic Information

Place of Origin Shanghai China (Mainland)
Brand Name QS
Model Number QS-GS360
metal grandstand We set up the grandstand for CCTV program for "Among Cities" in May, 2010 and won good reputation from the program group and the organizers Material:Q235 tube; Diameter:48*3.5mm,.42*2.3mm; Certificate:CE,ISO9001:2008; Advantage: 1. Light and fast It can be built quickly, easily and has a strong mobility, which meets the need of a wide range of operation . 2. Flexible, safe and reliable You can build a variety of specifications, multi-bay moveable scaffold depending on your actual needs, all kinds of perfect safety accessories, providing you with a solid, secure support in your operating. 3. Convenient in storage and transportation Small demolition storage area and convenient move by push, the convenient transfer of components can pass through a variety of narrow channels. Ring lock system scaffold components design loadSTANDARD LEDGERSCREW JACKSpaceLoadLengthCentralize LoadUniform LoadLengthDesign Load mKN/poleMKNKN/mmmKN0.6400.94.512L1<200451.2301.23.57200<L1<250421.8251.52.54.52.4201.82.03250<L1,30040Space: distance between the ledgers2.41.51.6 Compare features of scaffoldsItem Fastener tube scaffoldCup lock scaffoldRing lock system scaffoldComponentTube, fastenerStandard, LedgerStandard, Leger, DiagonalForce styleFriction, ShearAxial loadReliabilityFree frame node, diversity, low reliabilityFixed size component, steady structure, high safety.FlexibilitySize of frame is flexibleIn spite of limit by fixed size, the frame is quite flexible.LoadBay × lift × width0.6m × 0.6m ×1.5m0.6m × 0.6m ×1.5m0.6m × 0.6m ×1.5mLoad of standard1.7T2.5T2.8TErection efficiency134Wastage rate10%5%2%ConclusionFlexible frame, low reliability, excessive material, huge wastage more manpower and low efficiencyStandard structure,low flexibility,high reliability,low wastage,high efficiency.Standard structure,High load capacity,high reliability,low wastage, high efficiency

Delivery terms and packaging

Packaging Detail: 20 GP:16-20 tons;40 GP:21-24 tons;40 HQ:25-26 tons;Galvanized;Other packing information will be in accordance with your demands. Delivery Detail: 20 working days after received the deposit or L/C;
Port: Shanghai Port

Payment term

Letter of credit

Telegraphic transfer

Western Union

Фотографии

    Password recovery
    To recover your password, please enter in the box below your email address with which you have registered:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    An error has occurred. Please check your e-mail address and try again.
    Ваш новый пароль:

    Name is empty


    Выберите страну доставки

    You have not written a message

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    Your message has been sent!

    Close

    1
    Рынок B2B
    Cancel Close
      Show more close
        Area search
        Worldwide
        Категории
          Product