HC-202 Low pressure PU foaming machine

HC-202 Low pressure PU foaming machine

original price: 14 800 USD
China
Production capacity:
6 Set / Month
China
Beginner
86-0752-3766358
Gavin Zhu
Contact person

Basic Information

Place of Origin Guangdong China (Mainland)
Brand Name Hecheng
Model Number HC-202
HC-202 Low pressure PU foaming machine 1, Suitable material: Hard foam and semi-rigid Suitable temperature : 1825 Suitable viscosityISO600PAS,POLYLO3000PAS Mixing ratio (ISO: POLYLO): 1:1or 1:2 adjustable 2,Output capacity: 100g500g/sec Can adjust the output capacity according to the products requirement. Can change the speed of the pump via adjust the frequency of the converter; in that case, you can change the flow. Pouring time: 0.1-99.99/s (accuracy 0.01/s) 3,mixing head Belt type, mixed by stirring motor. The stirrer is made of high carbon steel. Wear resistant and high temperature resistant. The mixing head is equipped with self-clean system, which is controlled by electromagnetic valve, no leaking and corrosion resistance. LCD screen is place on the mixing head, which is connected with the PLC, easy to operate. 4,machines electronic control system Adopt PLC central control system. 5.7 inch touched LCD human-computer interface. Setting with manual and auto 2 kinds of operating mode, easy to operate. The controller has 50 working stations, which mean the machine can continuous to pouring 50 different moulds. PLC system can set and monitor the pressure, temperature, flow, clean and failures. 5,cooling system 2.5HP cooler, can cool and heat. When the temperature is lower than setting temperature, the cooler start to heat. To maintain the material tank keep constant temperature. When the temperature is higher than setting temperature, the cooler start to cool. To maintain the material tank keep constant temperature. Equipped with 2 PT100 heat detectors to monitor the ISO and POLY tanks temperature.

Delivery terms and packaging

Packaging Detail: LVL (Laminated Veneer Lumber) board. Vacuum packaging Delivery Detail: (for 1 set ) 10 working days after receiving the deposit.
Port: Shenzhen

Payment term

Letter of credit

Telegraphic transfer

Фотографии

    Password recovery
    To recover your password, please enter in the box below your email address with which you have registered:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    An error has occurred. Please check your e-mail address and try again.
    Ваш новый пароль:

    Name is empty


    Выберите страну доставки

    You have not written a message

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    Your message has been sent!

    Close

    1
    Рынок B2B
    Cancel Close
      Show more close
        Area search
        Worldwide
        Категории
          Product