GIV25CA220A solenoid valve, normally open

GIV25CA220A solenoid valve, normally open

original price: 20,00 USD
Beijing, China
Production capacity:
10000 Piece / Month
Beijing, China
Anonymous
86-010-51655362
13701089084
Peter Lee
Contact person

Basic Information

Port Size G1"
Place of Origin Beijing China (Mainland)
Model Number GIV25CA220A
Brand Name Green Island
Standard or Nonstandard Standard
Structure Shutoff
Pressure Medium Pressure
Power Solenoid
Temperature of Media Medium Temperature
Media Gas
APPLICATION: GIV25CA220Aclass A gas valves are used for control and regulation of gaseous fluids in gas power burners, atmospheric gas boilers, melting furnaces, incinerators and other gas consuming ppliances. Technical Data: Supply voltage:< 230/120Vac, 50/60 Hz,±10% Ambient temperature:<15°C - 60°C Maximum operating pressure: <200mbar Enclosure:< IP54 Opening time:<1 S Closing time:<1 S Electronic connection: DIN connection Maximum working frequency:< 20 per minute Number of cycles:> 200,000 Installation: Take care that installer is a trained experienced service man. *Turn off gas supply before starting installation. *Disconnect power supply to prevent electrical shock and/or equipment damage. Mounting position: *The gas valve can be mounted plus or minus 90 degrees from the vertical. Mounting location: *The distance between the gas valve and the wall/ground, must be at least 30 cm. Main gas connection threaded valves: *Take care that dirt shouldn’t enter the gas valve during handling. *Ensure the gas flows in the same direction as the arrow on the housing of the gas valve. *Use a sound taper fitting with thread according to ISO7--1(BS 21, DIN 2999) or a piece of new, properly reamed pipe, free from swarf. *Do not thread or tighten the pipe or pipe fitting too far. Otherwise valve distortion and malfunction could result. *Apply a moderate amount of good quality thread compound to the pipe or fitting only, leaving the two end threads bare. PTFE tape may be used as an alternative. *In order to tighten the pipe in the valve, do not use the actuator as a lever but use a suitable wrench operating on the wrench bosses. Tightness test after installation: *Paint all pipe connections and gaskets with a strong soap and water solution. *Start the appliance and check for bubbles. If a leak is found in a pipe connection, remake the joint. Ordering information: Model ConnectionVoltageSize(HxLXW)Pressure Switch PositionGIV10CA220A3/8''230105x70x67NoGIV10CA110A3/8''110105x70x67NoGIV15CA220A1/2'230105x70x67NoGIV15CA110A1/2'110105x70x67NoGIV20CA220A3/4''230120x90x77YesGIV25CA220A1''110120x90x77Yes CAUTION: The oiland body of gas valve will be heated after long time using. To be carefully to contact the gas valve with your hand at adjustment or maintenance.

Delivery terms and packaging

Packaging Detail: Packaged in cardboard boxes Delivery Detail: 1 week
Port: Beijing

Payment term

Telegraphic transfer

Фотографии

    Password recovery
    To recover your password, please enter in the box below your email address with which you have registered:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    An error has occurred. Please check your e-mail address and try again.
    Ваш новый пароль:

    Name is empty


    Выберите страну доставки

    You have not written a message

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    Your message has been sent!

    Close

    1
    Рынок B2B
    Cancel Close
      Show more close
        Area search
        Worldwide
        Категории
          Product