geomat

geomat

QINGWEI LI
Contact person

Basic Information

Features: 1) Can replace concrete, asphalt, stone and other slope protection material 2) Mainly applied to slope of road, railway and river lane, dams and dikes, and mountain slope 2) Can prevent land soil from water and rain erosion before grass covering grows 3) Can bear sourcing of high water space and high-speed water after grass covering grows 4) It can reduce cost of construction by width margin and the cost is only 1/7 concrete,1/8 stone 5) It adopts macromolecule material and anti-UV rays stability, and its chemical character is very stable, and there is no pollution to environment 6) Easy construction after surface of land is smooth 7) A kind of three dimensional structure new-type geosynthetical materials suitable for protecting water and land soil 8) Can effectively prevent water and land soil from flowing away, increase green land and improve living environmentOperation: 1) Can use bamboo pole or wood stick pass the whole roll net mat during construction, then pull net mat along slope, use wooden nail or plastic nail to fix four circle of net mat, distance between nails is 30cm, one square meter has 10 nails 2) Length of nail from land surface is usually 15cm, add nails on loose land, length of nail on up slope is longer than on down slope when construction on high slope 3) Pay attention to keep netting mat smoothly and add nails on sudden change place topography 4) Check carefully connecting. Length of connecting is 2cm, nail must be fixed in connecting place, nails density is added 100%, there is no internal and keep net mat closely on up net mat. Width of bore diameter on up nail is two times of netting mat hole, so can suppress on vertical direction 5) Depth of sowing takes actions that suit local circumstance, chose long root and suitable for local climate of grass seeds 6) Grass seeds sows in net mat, so can improve result of complex protect coating 7) After sowing, land soil must cover the netting mat. 8) After sowing, 40-50% water proportion in land soil is reasonable, and adding pressure on surface of land, so benefit for grass seed's growing 9) Longitude of connecting should have 60-degree angle, netting mat must be buried into land soil 30cm when laying on up slope. Bottom of slope should higher than level land. Also, open a ditch 20cm from up slope, so can easily irrigate 10) Lying time is earlier 3-4 months than rain season Note: 1) Don't apply to surface of gravel 2) Please choose to use less than 45-degree angle slope 3) Don't apply to against-sea situation 4) Only apply to planting seeds for protecting slope, no making deepen tendon-added material

Delivery terms and packaging

Packaging Detail: 2M X 30M /ROLL Delivery Detail: 5 DAYS
Port: QINGDAO

Payment term

Letter of credit

Telegraphic transfer

Western Union

Фотографии

    Password recovery
    To recover your password, please enter in the box below your email address with which you have registered:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    An error has occurred. Please check your e-mail address and try again.
    Ваш новый пароль:

    Name is empty


    Выберите страну доставки

    You have not written a message

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    Your message has been sent!

    Close

    1
    Рынок B2B
    Cancel Close
      Show more close
        Area search
        Worldwide
        Категории
          Product