FC0401U220 Flame Detector Relay

FC0401U220 Flame Detector Relay

original price: 32,00 USD
Beijing, China
Production capacity:
10000 Case / Month
Beijing, China
Anonymous
86-010-51655362
13701089084
Peter Lee
Contact person

Basic Information

Place of Origin Beijing China (Mainland)
Brand Name Green Island
Model Number FC0401U220
Type Gas Burner
Feature: FC0401U220Flame Detector Relays are essentially switches which, when used with the appropriate sensors, can signal the presence or absence of a flame or ultraviolet (UV) light. • Flame present and power indication. • Plug-in mounts onto a sub-base for surface mounting. (Housing meets IP40) SPECIFICATIONS: ELECTRICAL RATING: 230Vac (+ 10 % to - 15%), 50/60 Hz. CONTACT: 2 isolated SPDT contacts. RATING: 2 A at 0.65power factor. AMBIENT TEMPERATURE LIMITS: -10 to + 60 °C MAXIMUM RELATIVE HUMIDITY: 90% RH at + 40 °C. DEGREE OF PROTECTION: IP40 FLAME FAILURE RESPONSE TIME : Less than two second (standard models);Other timings available on request. Ordering Ingormation: Model Flame detector Flame signal output Power FC0401U220 UVRelay SPDT220Vac 50/60HzFC0401R220 IonizationRelay SPDT220Vac 50/60HzFC0402U220 UVRelay and 1-5Vdc220Vac 50/60HzFC0403U220 UVRelay and 4-20mA220Vac 50/60HzFC0401U110 UVRelay SPDT110Vac 50/60HzFC0401R110 IonizationRelay SPDT110Vac 50/60Hz INSTALLATION: 1. Disconnect the power supply before beginning the installation. 2. Whenever possible, use the burner/boiler manufacturer’s instructions. If these are not provided, follow the instructions below. Mount the sub-base 1. The sub-base may be installed in any plane, but the vertical is recommended. 2. Ensure that sufficient space is available to access the relay for servicing or removal. Wire the sub-base 1. Wiring and overload protection should conform to local electrical regulations 2. 2. Verify that the wiring is correct before plugging in the relay. Mount relay on the sub-base 1. Plug the relay into the sub-base. 2. Secure the relay to the sub-base by tightening the two captive screws on the relay face. 3. When installation is completed, check the flame current value as described below. CHECKOUT AFTER INSTALLATION • That system overload protection is correct. • That wiring connections are correct and that all terminal screws are tight • That the flame detector is correctly installed and that the correct flame detector is being used. • That the burner is completely purged and ready to fire with the fuel lines purged of air • That the combustion chamber and flues are clear of fuel. That power is on at the system main switch. CAUTION: 1. Terminal 2 must have a connection to earth. Otherwise, it is easy to destroy the device. 2. Terminal 12 should be connected to L of line power, and 11 to N. Wrong connection of the two terminals will destroy the controller or other equipments using with it.

Delivery terms and packaging

Packaging Detail: packaged in cardboard bowes Delivery Detail: 1 week
Port: Tianjin

Payment term

Telegraphic transfer

Фотографии

    Password recovery
    To recover your password, please enter in the box below your email address with which you have registered:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    An error has occurred. Please check your e-mail address and try again.
    Ваш новый пароль:

    Name is empty


    Выберите страну доставки

    You have not written a message

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    Your message has been sent!

    Close

    1
    Рынок B2B
    Cancel Close
      Show more close
        Area search
        Worldwide
        Категории
          Product