Drill rig

Drill rig

Nanjing, China
Production capacity:
5 Set / Month
Nanjing, China
Anonymous
86-25-84676361
Li Liang Gen
Contact person

Basic Information

Place of Origin Guangdong China (Mainland)
Brand Name Chance Door
Model Number CDAC1500HP
Drilling Rig Main Technical ParametersNominal drilling capacity23,000 ft (7000m), 4-1/2 DPMax. hook load1,000,000 lbs (4500 KN)Hoisting lines6x7 clockwiseMax. DP weight584,050 lbs (2600 KN)Diameter of drilling line1-1/2 (38 mm)Rated horse power of drawworks2000 HP (1500 KW)Drawworks hoisting speedSingle, step-less changeOpening diameter of rotary table37-1/2 (952.5 mm)Mud pump capacity x Qty.1600 HP (1176 KW) x 3Mast valid height & type158 ft (48m)& K typeDrill floor height34.5 ft (10.5m)Clear height of substructure29.5 ft (9m)Standpipe manifoldΦ140 mm x 35 Mpa, Dual standpipe. (5 1/2 x 5,000 PSI)Air source pressure0.7 0.9 Mpa (100 130 PSI)Air receiver(105x2+140) ft3, (3x2+4) m3Environment temperature-20 +50Relative humidity≤90%Auto drillerAuto driller VFD motor37 kwBit feeding speed0.3 120 ft/h (0.1 36m/h)Diesel setCAT3512B or CAT3516BDiesel engine quantity x main power4x1100KW or 3x1850KWA Brief DescriptionThe main power of the drilling rig is from 3 sets of CAT3516B 1850KW or 4 sets of CAT3512B 1100KW diesel generator sets. It adopts the advanced digital AC variable frequency technology. By means of the integrated design of electric transmission system PLC, touch screen and drilling instrument parameters of gas, electricity and fluids, the operation of intelligent control by driller is fully realized.It has front-open mast and double-hoisting substructure. The mast and all devices on the floor can be installed at a lower position. Drawworks is driven by shingle-shaft gear with one-shift stepless speed governor, which makes the mechanical transmission easy and reliable. The main brake is hydraulic disc brake and the auxiliary brake relies on energy consumption of motor. It is equipped with an automatic driller, which makes the operating control system simpler, easier and more convenient and the drilling operation safer and more reliable.The configuration of drilling rig meets the requirement of explosion-proof, safe drilling operation, convenient installing, disassembling and maintaining of equipment as well as the requirement for installation of top drive. In addition, it can be raised by the power of drawworks.The drilling rig can be divided into five areas, drilling floor area, pump house area, power/electric control area, mud circulation area, and water tank & fuel tank area.

Delivery terms and packaging

Packaging Detail: Bulk packing or by buyer Delivery Detail: in 6 days
Port: Shanghai

Payment term

Letter of credit

Telegraphic transfer

Фотографии

    Password recovery
    To recover your password, please enter in the box below your email address with which you have registered:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    An error has occurred. Please check your e-mail address and try again.
    Ваш новый пароль:

    Name is empty


    Выберите страну доставки

    You have not written a message

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    Your message has been sent!

    Close

    1
    Рынок B2B
    Cancel Close
      Show more close
        Area search
        Worldwide
        Категории
          Product