Copper Rod Wire Drawing Mill

Copper Rod Wire Drawing Mill

Deyang, China
Production capacity:
30 Set / Month
Deyang, China
Beginner
0086-0838-13508027181
2820278
zhengguo yang
Contact person

Basic Information

Place of Origin Sichuan China (Mainland)
Brand Name 141
Model Number LHD-450/13(9)
1. Product InformationLHD-450/13LHD-450/9Main MachineInlet Wire dia.Φ8.0mmΦ8.0mmOut Wire dia.Φ1.3 4.0mmΦ2.5-4.0mmMax. Linear speed22m/s14m/sMax. Drawing Pass13 9Finish Capstan Dia.Φ450mmΦ450mmSpeed ratio between capstans1.41-1.181.41-1.18Main motor280kW(DC)250kW(DC)Finish capstan motor75kW(DC)55kW(DC)Continuous AnnealerAnnealing Wire dia.Φ1.2 4.0mmΦ1.2 4.0mmMax. annealing speed20m/s13.0m/sMax. annealing voltage60V(DC)60V(DC)Max. annealing current6000A(DC)6000A(DC)Cooling water consumption20m³/h20m³/hAir consumption18 m³/h18 m³/hDual take-upAccumulating wheel length5.0m5.0mMax. take-up speed22m/s22m/sMax. traversing pitch6mm/r6mm/rTake-up motor power32kW×2(DC)32kW×2(DC)Take-up bobbinsPND500-630(DIN46397)PND500-630(DIN46397)Drop down coilerTake up speed18m/s18m/sTake-up motor power18.5kW(AC)18.5kW(AC)Wire rangeΦ1.8 3.5mmΦ1.8 3.5mmCoiling wheel dia.Φ800mmΦ800mmMax. loading weight1500 1800kg1500 1800kgOthersTotal weight50000kg47000kgOverall dimension27500×4400×5000mm25000×4400×5000mm2. Design / Structure / Details Pics 1) Features § The box body is cast part in whole one that can make perfect outlook and lower noise and vibration.§ All drawing blocks wheel which have equal diameter and are set in one row in certain degree. The special design can protect the wire against scratching and compressing.§ The operation is very convenient because of the block wheels in one row and oil immersion lubrication method and horizontal annealer. § Dual-motor driving and rapid mould-changing system; § High load carrying capacity and low noise; § This line adopts Dual take-up and has the high automation.2) Application This machine is used to draw ø1.30-ø4.0mm copper wires from 8mm rod.3. Factory View or Certificates

Delivery terms and packaging

Packaging Detail: Most of the parts are naked in container, while some parts are put in container with plywood box Delivery Detail: Within 60 days after receiving the 30% deposit
Port: Shanghai

Payment term

Letter of credit

Telegraphic transfer

Фотографии

    Password recovery
    To recover your password, please enter in the box below your email address with which you have registered:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    An error has occurred. Please check your e-mail address and try again.
    Ваш новый пароль:

    Name is empty


    Выберите страну доставки

    You have not written a message

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    Your message has been sent!

    Close

    1
    Рынок B2B
    Cancel Close
      Show more close
        Area search
        Worldwide
        Категории
          Product