Boilers gas kswo, outdoor

Boilers gas kswo, outdoor

Condition:
new
original price: 273 200 RUB
Dubna, Russia
Dubna, Russia
Anonymous
+7 (495)9712077
Иван
Contact person

Basic Information

Boilers gas KSWO, OUTDOOR units, single and double, hot water boilers, water tube, gidrologo type, single-loop, heat-insulated block-box. Boiler KSVA has a single or double heat exchanger, one or two open furnace equipped with one or two atmospheric gas burners. Boiler heat exchangers are made of finned tubes and belong to the class hydronic boilers (water velocity in pipes up to 2 m/sec). The boiler can run on network gas and liquefied gas fuel. The boiler is equipped with timosaponin valve, gas alarm for methane and the gas shut off valve. The boiler is equipped with one circulation pump. In the event of a failure of the primary pump is also delivered backup pump. The boiler belongs to low-temperature devices operating in the heating transactions closed type with forced circulation of coolant, are protected under binding rules. Can also work in heating the transactions of the open type with forced circulation of coolant, are protected under binding rules. The boiler is working in automatic mode with minimized maintenance. The device is equipped with systems protecting against failures in heating wiring: a system of tracking the flow of coolant inner temperature controller, thermal switch the safety valve. The boiler is installed circulating pump, thermomanometer, automatic air release valve, safety overflow valve, naprmer, the indicator on the methane shut-off valve, terminatory valve, electric contact pressure gauge, GSM modem. The equipment is subject to assessment (confirmation) of conformity to requirements of Technical regulations of the Customs Union TR CU 016/2013, which is carried out by certification and Declaration according to the diagrams in the regulation. Requirements of reliability: mean time to failure - 23000 h; average life to retirement - 10 years. Compliance of basic materials (sheet steel, pipe, rolling, forging, etc.) on the chemical composition and mechanical properties of NTD is confirmed by the quality certificate of the supplier of the material. Compliance of welding consumables standards and NTD is confirmed by the quality certificate and certificate of evaluation material in accordance with the requirements of RD 03-613. Dimensions of parts obtained by machining, in the absence of other requirements in the drawings have General tolerances according to GOST 30893.1: H14, h14, ±14/2 IT. The sizes of the diameters defining the sealing surface of type "protrusion-depression", "thorn-groove" performed for hole sizes – H12, shaft – h12. When butt-welding the offset edges along the outside diameter does not exceed 30% of the thickness of thin parts, but not more than 5 mm. The cost of boilers from 273200р. The production time is 30 days. Call us! our experts will answer Your questions.

Delivery terms and packaging

Unfortunately the seller did not specify the terms of delivery. For more information, contact the seller.
Фотографии

    Password recovery
    To recover your password, please enter in the box below your email address with which you have registered:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    An error has occurred. Please check your e-mail address and try again.
    Ваш новый пароль:

    Name is empty


    Выберите страну доставки

    You have not written a message

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    Your message has been sent!

    Close

    1
    Рынок B2B
    Cancel Close
      Show more close
        Area search
        Worldwide
        Категории
          Product