Ort der Herkunft |
Beijing China (Mainland) |
Marke |
huaqian |
Modell-Nummer |
TD-6 Epoxy Resin Grouting Materia... |
TD-6 Epoxy Resin Grouting Material DescriptionThe product is made of epoxy resin\ hardener\ various additives.FeaturesHigh-intensity & early strength: compressive strength (1d)≥50Mpa. The effect better than general materials. Low-level hate peak immersion: suitable to large velum grouting, operating time can reach as long as 60 min.Flowability flowability≥300mm, it can fill all of the gap and accord to secondary grouting requirements.Perfect stabilit It can Long-term use in -50°C -- +80°C \ -58 °F-- 176 °F and ensure equipments location long-term precise.Tenacity it can burden any force from operating instrument. Erosion resistance can burden long contact erosion with acid,alkali,salt,oil and other chemical product, long endurance and conform to Green Environmental Protection Requirements. Application1. It can be used in the secondary grouting installation of compressor \pump\punch machine \crusher\ball grinder\and other high vibration equipment etc; it can be also used in the grouting of equipment foundation section which subjects to chemical erosion.2. It can be used in the grouting of tract foundation bridge, heavy in pressure section etc, and also in the connection of for example the grouting of track foundation and bridge support saddle. And rigidity connection of iron, pole constructed by reinforcing steel bar. 3. It can be used in concrete\stone\steel, plank and so on, it can be used as self leveling mortar.SpeciationperformanceStandard1day3days7daysfinal strengthcompressive strengthGB/T50081-2002>50M pa>65M pa>95M pa>100M pabending strengthGB/T50081-2002>10M pa>15M pa>20M pa>25M paPull-out resistance strengthGB/T50081-2002>8M pa>12M pa>15M pa>17M paelastic modulusGB/T5081-2002//>18000M pa>18500M palinear shrinkage rateHG/T2625-94//<0.012%<0.012%heat emission rateHG/T2625-94<42°C\ 108 °Fshape stabilityGBJ82-85<1.0×10-3mm/mm(180days)thermal expansion coefficientGBJ119-88<40×10-6mm/mm/°C(28 days forming, test in 0-60°C\ 32-140°C)Notes: The data come from lab (23±2°C\ 73±2°F \ relative humidity 50±5%. and after 7days conserve. And accelerating curing 6 hours in 60°C\140°F)How to use1st. surface preparation 2nd.Mould board installation 3rd.temperature requirementsIn order to achieve the best condition, you should warm up the material to 15-25°C\ 59-77°F. The construction & curing temperature should be controlled in 5-32°C\41-90°F.( 20°C\68°F is better ).4th.Mixing 1.(1)Mixing portion Part A/Part B/Part C = 1/4/6 (2)Check the quantity/size//type and manufacture date, to make sure the product is within warranty period. 2. First, put Part B into the container, stir while mix Part C. Then put Part A into container Stir well. 5th.Grouting construction 6th . The relation between the temperature and the solidification: Temperature Condition 18°C\64°F 25°C\77°F 32°C\90°F Primary time 3h 2h 1.5h Final time 72h 48h 36h