Ort der Herkunft |
Jiangsu China (Mainland) |
Marke |
Marui |
Modell-Nummer |
adjustable |
Item materials Surface treatment Spec(mm) Different ledger Q235 steel pipe Hot dip galvanization 600×48×3 Q235 steel pipe Spray paint 900×48×3 Q235 steel pipe Electrioplate Zinc 1500×48×3 Q235 steel pipe Painting plastic 2000×48×3 Q235 steel pipe Spray paint 2500×48×3 different standard Q235 steel pipe Electrioplate Zinc 1200×48×3.2 Q235 steel pipe Spray paint 1800×48×3.2 Q235 steel pipe Hot dip galvanization 2000×48×3.2 Q235 steel pipe Spray paint 2400×48×3.2 Q235 steel pipe Electrioplate Zinc 3000×48×3.2 Different Brace Q235 steel pipe Electrioplate Zinc 1500×48×3 Q235 steel pipe Painting plastic 1800×48×3 Q235 steel pipe Spray paint 2500×48×3 Q235 steel pipe Painting plastic 3000×48×3 Base/top support Q235 steel pipe Hot dip galvanization 600×48 Q235 steel pipe Electrioplate Zinc 300×48 Q235 steel pipe Hot dip galvanization 600×48 Q235 steel pipe Electrioplate Zinc 300×48 Q235 steel pipe Electrioplate Zinc 600×48×5 Materials: Q195, Q215, Q235 welded steel pipe and also do as your requirement.producing process: Cutting, forged, casted, pressed, welding, pained.Surface treatment: hot dip galvanization, electroplated zinc, spray painting,plastic painted.4. Vertical height: 1.0m-2.0m-3.0m middle disc interval 0.5m or 0.6m and your any size 5. Horizontal ledger: 0.6m-0.9m-1.3m-1.8m-2.5m-3.0m and your any size. 6. Installation: a. put the ledgers inserts into the bottom bowl. b. Drop down the top bowl and rotate. a. put the plug into the disc c. tighten the top bowl with hammer. b. tighten the insert with hammer 7. Disassemble: tighten the top bowl and collect the components. 8. Widely uesd: can be widely applied to construction, bridge tunnel, equipment installation, decoration, shipbuilding and other projects. 9. Components: ledger, standard, brace, base jack, joint stick and pin, connect pin, transom. 10. Export market: Middle East, Asia, Africa, West Europe, South America. 11. Quality control: certificate JOD1996 and OD15001-1205. ISO9001-2008 12. Ringlock scaffolding has fewer components, easy and convenient to install, disassemble, save time and effort to erect. 13. Advanced structural design and heavy load bearing capacity. 14. Overcome the difficulty of non-standard construction, suited to diverse range of on-site scaffold operations. 15. Single scaffold kit, no extra clamps or accessories required, no small parts. 16. Individual scaffolding parts can be packed in bundles for easy storage and transportation. 17. Scaffolding Packing: Palletized in steel pallet and baled with steel tape. 18. Pre-measurement components, no measurement needed. 19. Ringlock facade system is a unique design for heavy duty construction. 20.There are no loose components on the ringlock that can be lost or require maintenances