Ort der Herkunft |
Hunan China (Mainland) |
Marke |
GUOTONG ELECTRIC |
Modell-Nummer |
GT8200 |
GT8100 electric power plant automation system is a set I in SCADA systems, automation and computer integrated protection research and development experience, and with reference to similar products at home and abroad, focused on R & D talents automation power automation product, automation of centralized power elite self-development R & D devoted to the automation of power plant electric automation products. The incorporation of the system reliability of Taixingshishi Gao monitoring software platform with communications network (Ethernet) to achieve intelligent measurement and control device based on the hierarchical Baohu distributed integrated automation Gongneng, can Yingyong Yu Fa Dianchang main control room, Shi Xian Dian Qi monitoring the whole plant , protection, remote functions, and open DCS system can be realized with the DCS system interface communication has greatly enhanced the automation Power Plant Operating Degree, the technology is the power plant electric automation technology trends GT8200 station automation system can be divided into three layers: Station-level control layer, communication layer and spacing layer; station level control layer including the standby server, operator workstations, engineering workstations, communications processors, print servers and other equipment; communication layer from the the interval level and station level control layer bridge, an order and upload the next data collection point; spacing layer is responsible for collecting data and send back the implementation of the remote control, remote transfer orders, mainly limited to the control unit unit (LCU) , public / switching station LCU (LCU), the gate is to control the unit (LCU), pre-communication machines and other equipment elements. In addition, GT8200 station automation system is also equipped with GPS clock synchronization device; Chinese voice alarm device; uninterruptible power supply (UPS); analog signal return screen; large screen projector; remote monitoring terminal; operator control lamp device, the user can water Power demand for the actual monitoring, technical and economic comparison, selection of superior cost performance configuration.