GIV25CA220A Magnetventil, stromlos offen

GIV25CA220A Magnetventil, stromlos offen

original-Preis: 20,00 USD
Peking, China
Produktionskapazität:
10000 Stück / Monat
Peking, China
Anonym
86-010-51655362
13701089084
Peter Lee
Kontaktperson

Basisdaten

Port-Größe G1"
Ort der Herkunft Beijing China (Mainland)
Modell-Nummer GIV25CA220A
Marke Green Island
Standard ja
Struktur Abschaltung
Druck Mitteldruck
Energie Magnetspule
Temperatur von Medien Medium Temperatur
Medien Gas
APPLICATION: GIV25CA220Aclass A gas valves are used for control and regulation of gaseous fluids in gas power burners, atmospheric gas boilers, melting furnaces, incinerators and other gas consuming ppliances. Technical Data: Supply voltage:< 230/120Vac, 50/60 Hz,±10% Ambient temperature:<15°C - 60°C Maximum operating pressure: <200mbar Enclosure:< IP54 Opening time:<1 S Closing time:<1 S Electronic connection: DIN connection Maximum working frequency:< 20 per minute Number of cycles:> 200,000 Installation: Take care that installer is a trained experienced service man. *Turn off gas supply before starting installation. *Disconnect power supply to prevent electrical shock and/or equipment damage. Mounting position: *The gas valve can be mounted plus or minus 90 degrees from the vertical. Mounting location: *The distance between the gas valve and the wall/ground, must be at least 30 cm. Main gas connection threaded valves: *Take care that dirt shouldn’t enter the gas valve during handling. *Ensure the gas flows in the same direction as the arrow on the housing of the gas valve. *Use a sound taper fitting with thread according to ISO7--1(BS 21, DIN 2999) or a piece of new, properly reamed pipe, free from swarf. *Do not thread or tighten the pipe or pipe fitting too far. Otherwise valve distortion and malfunction could result. *Apply a moderate amount of good quality thread compound to the pipe or fitting only, leaving the two end threads bare. PTFE tape may be used as an alternative. *In order to tighten the pipe in the valve, do not use the actuator as a lever but use a suitable wrench operating on the wrench bosses. Tightness test after installation: *Paint all pipe connections and gaskets with a strong soap and water solution. *Start the appliance and check for bubbles. If a leak is found in a pipe connection, remake the joint. Ordering information: Model ConnectionVoltageSize(HxLXW)Pressure Switch PositionGIV10CA220A3/8''230105x70x67NoGIV10CA110A3/8''110105x70x67NoGIV15CA220A1/2'230105x70x67NoGIV15CA110A1/2'110105x70x67NoGIV20CA220A3/4''230120x90x77YesGIV25CA220A1''110120x90x77Yes CAUTION: The oiland body of gas valve will be heated after long time using. To be carefully to contact the gas valve with your hand at adjustment or maintenance.

Lieferbedingungen und Verpackung

Packaging Detail: Packaged in cardboard boxes Delivery Detail: 1 week
Hafen: Beijing

Zahlungsbedingungen

Telegraphic transfer

Фотографии

    Passwortwiederherstellung
    Um Ihr Passwort wiederherzustellen, geben Sie hier Ihre EMail-Adresse ein, mit der Sie sich bei uns registriert haben:
    Der Code zum Zurücksetzen des Passworts wurde an Ihre E-Mail gesendet.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    Es ist ein Fehler aufgetreten. Bitte überprüfen Sie Ihre EMail-Adresse und versuchen Sie es nochmal.
    Ваш новый пароль:

    Name ist leer


    Выберите страну доставки

    Sie haben keine Nachricht geschrieben

    Durch das Anklicken des Buttons "Abschicken" erklären Sie sich einverstanden, daß Ihre Daten zur Bearbeitung Ihres Anliegens verwendet werden. Weitere Informationen und Widerrufshinweise finden Sie in der Dateschutzerklärung.

    Ihre Nachricht wurde versendet!

    Schließen

    1
    Рынок B2B
    Cancel Close
      Mehr zeigen zuklappen
        Regionsuche
        Weltweit
        Категории
          Produktbezeichnung