FC0401U220 Flammenmelder Relais

FC0401U220 Flammenmelder Relais

original-Preis: 32,00 USD
Peking, China
Produktionskapazität:
10000 Fall / Monat
Peking, China
Anonym
86-010-51655362
13701089084
Peter Lee
Kontaktperson

Basisdaten

Ort der Herkunft Beijing China (Mainland)
Marke Green Island
Modell-Nummer FC0401U220
Geben Gas-Brenner
Feature: FC0401U220Flame Detector Relays are essentially switches which, when used with the appropriate sensors, can signal the presence or absence of a flame or ultraviolet (UV) light. • Flame present and power indication. • Plug-in mounts onto a sub-base for surface mounting. (Housing meets IP40) SPECIFICATIONS: ELECTRICAL RATING: 230Vac (+ 10 % to - 15%), 50/60 Hz. CONTACT: 2 isolated SPDT contacts. RATING: 2 A at 0.65power factor. AMBIENT TEMPERATURE LIMITS: -10 to + 60 °C MAXIMUM RELATIVE HUMIDITY: 90% RH at + 40 °C. DEGREE OF PROTECTION: IP40 FLAME FAILURE RESPONSE TIME : Less than two second (standard models);Other timings available on request. Ordering Ingormation: Model Flame detector Flame signal output Power FC0401U220 UVRelay SPDT220Vac 50/60HzFC0401R220 IonizationRelay SPDT220Vac 50/60HzFC0402U220 UVRelay and 1-5Vdc220Vac 50/60HzFC0403U220 UVRelay and 4-20mA220Vac 50/60HzFC0401U110 UVRelay SPDT110Vac 50/60HzFC0401R110 IonizationRelay SPDT110Vac 50/60Hz INSTALLATION: 1. Disconnect the power supply before beginning the installation. 2. Whenever possible, use the burner/boiler manufacturer’s instructions. If these are not provided, follow the instructions below. Mount the sub-base 1. The sub-base may be installed in any plane, but the vertical is recommended. 2. Ensure that sufficient space is available to access the relay for servicing or removal. Wire the sub-base 1. Wiring and overload protection should conform to local electrical regulations 2. 2. Verify that the wiring is correct before plugging in the relay. Mount relay on the sub-base 1. Plug the relay into the sub-base. 2. Secure the relay to the sub-base by tightening the two captive screws on the relay face. 3. When installation is completed, check the flame current value as described below. CHECKOUT AFTER INSTALLATION • That system overload protection is correct. • That wiring connections are correct and that all terminal screws are tight • That the flame detector is correctly installed and that the correct flame detector is being used. • That the burner is completely purged and ready to fire with the fuel lines purged of air • That the combustion chamber and flues are clear of fuel. That power is on at the system main switch. CAUTION: 1. Terminal 2 must have a connection to earth. Otherwise, it is easy to destroy the device. 2. Terminal 12 should be connected to L of line power, and 11 to N. Wrong connection of the two terminals will destroy the controller or other equipments using with it.

Lieferbedingungen und Verpackung

Packaging Detail: packaged in cardboard bowes Delivery Detail: 1 week
Hafen: Tianjin

Zahlungsbedingungen

Telegraphic transfer

Фотографии

    Passwortwiederherstellung
    Um Ihr Passwort wiederherzustellen, geben Sie hier Ihre EMail-Adresse ein, mit der Sie sich bei uns registriert haben:
    Der Code zum Zurücksetzen des Passworts wurde an Ihre E-Mail gesendet.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    Es ist ein Fehler aufgetreten. Bitte überprüfen Sie Ihre EMail-Adresse und versuchen Sie es nochmal.
    Ваш новый пароль:

    Name ist leer


    Выберите страну доставки

    Sie haben keine Nachricht geschrieben

    Durch das Anklicken des Buttons "Abschicken" erklären Sie sich einverstanden, daß Ihre Daten zur Bearbeitung Ihres Anliegens verwendet werden. Weitere Informationen und Widerrufshinweise finden Sie in der Dateschutzerklärung.

    Ihre Nachricht wurde versendet!

    Schließen

    1
    Рынок B2B
    Cancel Close
      Mehr zeigen zuklappen
        Regionsuche
        Weltweit
        Категории
          Produktbezeichnung