GZH208 Epoxy Zinc-rich coating Composition:epoxy resin,Polyamide resin,zinc powder, Pigment, Solvent, accessory ingredient Characteristic:with cathodic protection, Chemical inhibition, Shield function. Strong adhesion, good mechanical properties,excellent matching capability Use: The paint is applied to the steel corrosion under the environment of PH5-9 Basic standard Item Standard 1.mixing ratio: weight ratio main agent/curing agent=9:1(30m after rinening 2.specific gravity: 2.0 3.thickness: dry film:50 wet film:100 4.coating rate: 280 5.Storage temperature: 25°c 6.Storage period: one year 7.salt water resistance: 500h without bubbling and rustying 8.adhesion: ≤2 9.flexibility: ≤2mm 10.impact resistance: 50kgf•cm 11.pencil hardness: >2H 12.dry time: surface drying time≤1h; actural drying time≤24 Construction data 1.way of painting: spraying,brush painting,roller painting 2.diluent: X-7 3.construction temperature: 10 45 4.re-coating time: shortest time: 24h under 25°c,longest time:one month(without znic on film surface) 5.surface treatment: remove the rust to make it reach the standard of ISO st2.5or ISO st3.0 6.matching paint:epoxy,cholorinated rubber,asphalt, polyurethane, ethylene, fluorocarbon and so on Construction Conditions 1.relative humidity: ≤80% 2.steel’s surface temperature: 3 degrees higher than dewpoint 3.wind: ≤3 4.the air should be clean,and without oil and water 5. Rain, snow and ice days or occasion of sand is not suitable for construction.you should stop painting on occasion of mentioned conditions,and protect the painted part well,also you should check if the film is normal before next construction,or you should deal it before next process.After painting you should keep it from water and fog and paint the intermediate paint and primer as soon as possible.