Macht |
Elektronisch |
Ort der Herkunft |
Zhejiang China (Mainland) |
Marke |
yongbei |
Modell-Nummer |
yongbei |
I. Overview: Powder coating is a surface coating technology to a new technology, compared with the painting process, with non-polluting, energy saving, high efficiency, safety and coating adhesion is good. Currently, widely used in China and abroad. Powder coating complete sets of equipment has the following characteristics: 1. Spray chamber and recycling non-pipe connection, small size, damping to reduce suction. 2. For the fluidized powder for powder for the powder evenly. 3. Recycling used filter, with a pulse-jet cleaning type cleaning device, change colors and convenient. 4. Room Spray both sides of openings, as the import and export channel parts can be matched with the flowing body. 2, technical requirements: 1. Dimensions: Overall width × depth × height 2500 × 1600 × 2100 2. Indoor spraying chamber dimensions: width × depth × height 1500 × 1200 × 1500 3. Current: 380V 50Hz three-phase electricity Installed Power: 2.2 kilowatts 4. High-voltage generator (power supply 220V, output voltage 0 to 100 kV, the maximum output current of 200 microamps) 5. Air Source: Air consumption: 0.6m3 Gas pressure: 8 kg / cm 2 6. Powder for powder barrel maximum storage capacity: 30 kg 7. Accounted for on the ground after installation: width × depth × height 3000 × 2600 × 2100 8. Machine total weight: 500 kg 3, the main component parts: 1. Powder room plus three filter collector; 2. Fan (2.2 kW); 3. Compressed air bag and pulse-jet cleaning device; 4. Gas-control cabinet; 5. Work with the rail transportation; 6. Spray car (which includes: a high-voltage generator, a tube fluidized bed for powder, a powder gun, spraying a pair of small-frame); Electric oven electric operating instructions1, check the box on the power supply operation indicator light is bright, as light indicates normal power supply. 2, open loop fan Kai / off knob, so that fans operate normally. Third, set the temperature controller of the upper and lower temperature, usually set the temperature required for the actual process temperature of 90%, under normal production conditions are not required to operate this step. Another re-set the production process required drying time, the timer in seconds (0 9999 seconds). 4, open the heater start / stop knob, this time heated oven began to heat up. 5, when the temperature rose to process the required temperature, timer power to begin drying time to time on the workpiece, when the time to reach the required process when the heater will automatically shut down timer at this time also shows that the total time time, Heaters should be at this time start / stop switch to stop the state, open the oven door pull the workpiece. 6, For re-drying the workpiece, the method according to the above operations can be. 7, shut down, the heater must be off, then off circulation fans, the last off the total power supply. Note: The drying oven 48 each time 15kg LPG cylinders, equipment, total power 30KW circulation fans must be started, otherwise the heater will not start the work.