aac-Ziegel-Maschine, Schneidemaschine, Blockschneider

aac-Ziegel-Maschine, Schneidemaschine, Blockschneider

original-Preis: 300,00 USD
Shanghai, China
Produktionskapazität:
10 Einstellen
Shanghai, China
Anonym
86-21-36044145
Betty Zhang
Kontaktperson

Basisdaten

AACblock cutterof STM Work principle: Upset hoist bring mould base body sky 90 of upset is it cut car to put together, drawing of patterns is it at cutting car , cut base body with side board car power by electrical machinery and walk to stay, finish cuts vertically , mills the trough , level to cutting through cutting the device vertically; Cut the car and continue walking after the central position of the crosscut device stops, the crosscut device is started, crosscut shelf from top to bottom vertical to is it is it finish horizontal to cut to cut to lay; Cut car walk to organize into groups hoist place organize into groups hoist hang to is it raise car to steam base body (incline board in succession ) again, cut car return to primitive position carry on next to cut circulation. Character: 1. the model structure is simplified practically, the maintenance easy to install; 2. the base body side sets up and puts and makes the width of base body 600 mm, the height is 1200 mm, cuts the steel wire short, difficult to break, it is difficult to float, it is high to cut the precision; 3.the vertical cutting equipment is regular, cut the small garage and leave and finish cutting vertically, cut time shortly. Crosscut device adopt steel wire cut under the level, is it cut steel wire length to shorten , guarantee precision of cutting. 4.Base body side can vertical to is it mill trough to finish when cutting after setting up is it mix notch process the equipment separately to need; 5.Copies of model make to base body six cut, products quality does not out of shape to influence mould oil have; 6.A model can also produce the panel besides producing the building block; 7.Model cut course (upset, vertical cut, crosscut) is it finishes with the Engineer location to divide every engineering location work simplification, operate and maintain it conveniently.

Lieferbedingungen und Verpackung

Packaging Detail: Seaworthy packing Delivery Detail: 30 days after the down payment
Hafen: Shanghai

Zahlungsbedingungen

Letter of credit

Telegraphic transfer

Фотографии

    Passwortwiederherstellung
    Um Ihr Passwort wiederherzustellen, geben Sie hier Ihre EMail-Adresse ein, mit der Sie sich bei uns registriert haben:
    Der Code zum Zurücksetzen des Passworts wurde an Ihre E-Mail gesendet.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    Es ist ein Fehler aufgetreten. Bitte überprüfen Sie Ihre EMail-Adresse und versuchen Sie es nochmal.
    Ваш новый пароль:

    Name ist leer


    Выберите страну доставки

    Sie haben keine Nachricht geschrieben

    Durch das Anklicken des Buttons "Abschicken" erklären Sie sich einverstanden, daß Ihre Daten zur Bearbeitung Ihres Anliegens verwendet werden. Weitere Informationen und Widerrufshinweise finden Sie in der Dateschutzerklärung.

    Ihre Nachricht wurde versendet!

    Schließen

    1
    Рынок B2B
    Cancel Close
      Mehr zeigen zuklappen
        Regionsuche
        Weltweit
        Категории
          Produktbezeichnung