Ort der Herkunft |
Shanghai China (Mainland) |
Marke |
SGPPC |
Modell-Nummer |
SG-1200GF-CNG |
1. Main technical specification of natural gas gensets Model of generating sets SG-1200GF-CNGModel No. and Brand of engine H16V190ZLT-2 Ji ChaiRated power KW 1340Rated speed r/min. 1000Rated voltage V 400/230Rated frequency Hz 50Rated power factor 0.8Supply method 3 phases 4 linesExcitation method brushlessStarting method 24V DC starter 24VCooling method Opened water cooled Speed modulate method Electronic controlNet weight kg 16500 2. Main electrical performance data Voltage Stable regulating rate ±2.5% Instantaneous regulating rate ≤±15% Recovery time ≤2s Fluctuation ≤1% Frequency Stable regulating rate 0 5% Instantaneous regulating rate ≤±5% Recovery time 7s Fluctuation ≤1% 3. Main technical data of engine Model No. and Brand of engine H16V190ZLT-2 Ji ChaiRated power/speed 1340KW/1000rpmModel of control system EGS02(WOODWARD COMPANY)Overall dimension L×B×H(mm) 3820×1792×2315Net weight 9300kgSpecific heat consumption ≤9500KJ/KW.hSpecific oil consumption ≤1.0g/KW.hNumber and layout of cylinders 12cylinders, 60° V typeType Four stroke, water cooled, turbocharged and aftercooled, direct injectonBore 190mmStroke 215mmCompression ratio 10 to 1Direction of rotation (facing to end) Counter-ClockwiseLubricating method Pressure and splash lubrication 4. Supply scope Natural gas engine/ alternator/ common base/ control panel/silencer/spare parts/ spare tools/ battery charger/ battery/ export wooden case/ document/ Commodity inspection. 5,Natural Gas Components Requirement Requirement of the gas quality of the unit: Item CH4 C2H6 C3H8 C4H10 H2S N2 CO2 Content(%) ≥76 less than10 less than8 less than6 less than0.1 less than2 less than1 Heat value -- 41860KJ/Nm3(10000kCal/Nm3) Requirement of the Gas purification Item Oil ,water Dust Sulfid Dust particles Content(%) No liquid less than10 less than20 less than50um 6,Delivery data :2 Months after contract valid or negotiation by both parties. 7,Warranty period: one year from the delivery date. 8,Terms of Payment: After contract, you should pay our company 30% of the contract amount and pay the other 70% before delivery.