walk thru frame scaffolding

walk thru frame scaffolding

青岛市, 中国
青岛市, 中国
公司
0086-532-88202329
Bonnie HUANG
联系人姓名

基本信息

出生地 Shandong China (Mainland)
牌子的名字 PUDE
模式的数量 WT
walk through frame scaffolding Item:1219*1524,1219*1700,1219*1930 and so on Data: 42.7*2.3mm lock:fliplock Surface: HDG,EG,paint, electrophoretic paint components of assembling 1.Main frame Insert the main frame into jack base section in per pendicular position 2cross brace for fixing the main frame in each span of scaffolding 3.Joint pin insert into the top of main frame for joining the required dimension 4.Horizontal frame or catwalk It is a lateral pipe frames used for fixing the main frame to complete the first floor scaffolding.it can be erected with about 2 to 4 spans in each high rision floor alternately. 5.jack base It is a base seat for adjusting and fixing the required scaffolding length above the wooden planks.

交货条款及包装

Packaging Detail: standard packing Delivery Detail: within 30 days after your order
端口: Qingdao Port

付款条款

Letter of credit

Telegraphic transfer

Фотографии

    密码恢复
    要恢复您的密码,请在下面您的电子邮件地址框与您已注册请输入:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    发生了错误。请检查您的电子邮件地址,然后再试一次。
    Ваш новый пароль:

    名称为空


    Выберите страну доставки

    您还没有写消息

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    已发送您的消息!

    親密

    1
    Рынок B2B
    取消
      查看更多
        地區搜索
        全球
        Категории
          产品名称