Floor Automatism Notch Line SynopsisSolid wood flooring production line5+6 LT(K)+ DTS25-12D Major equipment on the following: A. Feeding Rolling Table (front) (GTB.1): Positioning separation, multi-sheet after a separation then a subsequent transportation to the next procedure. B. Longitudinal Single Rail Machine LT(K)01-10D: A pair of vertical sheet molding, five of the 10 axis preparation, Processing by the motor to change the overall width adjustment, convenient and quick. All spindle free to rotate, single-track preparation, on both sides of the slider control with the tip height difference. C. Longitudinal Brush Dust Machine (SG): In vertical slotted right after brushing the surface of the work piece with ash. D. Feeding Rolling Table (central) (GTB.2): Vertical processing will be completed sheet into the next process. E. Automatism Feeding Rack (GT): Right transportation to the plate in the precise location of a single-chip stocks after separation into the next process. F. Electrical Control System (GT.D): The coordination of the whole production line control. G. Transverse Double end Milling Machine (DTS25-12D): The two ends of a pair of sheet molding. Jump knife used to eliminate nap. Precision control for the level of bad 0.02- 0.05 mm, straightness 0.05 millimeters per meter, vertical degrees of 0.05 mm / 100. According to plate features to layout the location of a knife jumping.