Safe durable reliable convenient ringlock scaffold

Safe durable reliable convenient ringlock scaffold

原价: 1 000 USD
浯溪镇, 中国
生产能力:
5 吨 / Day
浯溪镇, 中国
无名
86-510-83216679
yezhen Sha
联系人姓名

基本信息

出生地 Jiangsu China (Mainland)
牌子的名字 Marui
模式的数量 adjustable
Materials: Q195, Q215, Q235 welded steel pipe and also do as your requirement.producing process: Cutting, forged, casted, pressed, welding, pained.Surface treatment: hot dip galvanization, electroplated zinc, spray painting,plastic painted.4. Vertical height: 1.0m-2.0m-3.0m middle disc interval 0.5m or 0.6m and your any size 5. Horizontal ledger: 0.6m-0.9m-1.3m-1.8m-2.5m-3.0m and your any size. 6. Installation: a. put the ledgers inserts into the bottom bowl. b. Drop down the top bowl and rotate. a. put the plug into the disc c. tighten the top bowl with hammer. b. tighten the insert with hammer 7. Disassemble: tighten the top bowl and collect the components. 8. Widely uesd: can be widely applied to construction, bridge tunnel, equipment installation, decoration, shipbuilding and other projects. 9. Components: ledger, standard, brace, base jack, joint stick and pin, connect pin, transom. 10. Export market: Middle East, Asia, Africa, West Europe, South America. 11. Quality control: certificate JOD1996 and OD15001-1205. ISO9001-2008 12. Ringlock scaffolding has fewer components, easy and convenient to install, disassemble, save time and effort to erect. 13. Advanced structural design and heavy load bearing capacity. 14. Overcome the difficulty of non-standard construction, suited to diverse range of on-site scaffold operations. 15. Single scaffold kit, no extra clamps or accessories required, no small parts. 16. Individual scaffolding parts can be packed in bundles for easy storage and transportation. 17. Scaffolding Packing: Palletized in steel pallet and baled with steel tape. 18. Pre-measurement components, no measurement needed. 19. Ringlock facade system is a unique design for heavy duty construction. 20.There are no loose components on the ringlock that can be lost or require maintenances

交货条款及包装

Packaging Detail: Scaffolding Packing: Palletized in steel pallet and baled with steel tape. Delivery Detail: 15 days after receive your deposit or L/C
端口: Shanghai

付款条款

Documents Against Payment

Letter of credit

Telegraphic transfer

Western Union

Фотографии

    密码恢复
    要恢复您的密码,请在下面您的电子邮件地址框与您已注册请输入:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    发生了错误。请检查您的电子邮件地址,然后再试一次。
    Ваш новый пароль:

    名称为空


    Выберите страну доставки

    您还没有写消息

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    已发送您的消息!

    親密

    1
    Рынок B2B
    取消
      查看更多
        地區搜索
        全球
        Категории
          产品名称