热交换器

热交换器

中国
生产能力:
1000 单元 / 月
中国
公司
86-029-88630938
13363905121
Ruby Yang
联系人姓名

基本信息

出生地 Shaanxi China (Mainland)
牌子的名字 ding xing
模式的数量 DXX
Summarize This product is the company in absorbing domestic and foreign many advantages of direct heaters, developed a new heater, it has a noise effect is good, vibration of small, simple structure, easy to install. But saving energy, heat utilization by up to 98%, suitable for the food, chemical industry, etc. all preparation with steam and hot water and boiled water. Working principle DXX Rotary heater muffler cavity ring wall distribution of a number of group size and path matching hole, when steam holes from ramp to speed down, cold water from each set of supporting another hole in Jet, both rapid heat, due to heater steam is along the tangent direction of rotation, this significantly reduces the steam for heating liquid impact angle, effectively reduced because the steam on the liquid impact vibration and noise. On the other hand steam along the tangent direction rotation driven shoots, is heated liquid produces co-rotating, hot and cold on rheological more frequently, this process makes the noise generated by steam bubble, the pressure to a minimum, and the entire container of liquid in the rotation movement is quickly heating Installation 1,When you use the product, shall be at least immersed under water, and leave the container 300mm wall and bottom not less than the best placed to 200mm, container for the Geometry Center 2,Selection, pipe diameter should be greater than or equal to the heater of the nominal passes the diameter, the parallel use of multiple heater, steam pipe cross sectional area should be greater than or equal to all the heater connection pipe cross-sectional area of 3,Steam pressure greater than 0.5MPa (gauge pressure) should be mounted steam relief pressure valve-vacuum, its retro filter before 4,Steam pipeline near heaters, shall check valve, prevent stop steam, place siphon, cause water backflow of accident 5,Near heaters steam pipe should secure strong fixed, make it work, not to swing 6,Heater multiple parallel use, should be evenly distributed, because the greater the weight, should be supported, install location depending on the circumstances on site 7,Water tank of water temperature and water level, the use of temperature control instrument and water level control instrument for measurement and control 8,Use if the heater heating speed may be slow, its internal steam holes are blocked, you should remove the heater will plug vents clean of impurities, and dirt from the outfall, heater best monthly cleanup once

交货条款及包装

Packaging Detail: Standard factory packages. Delivery Detail: 25 days After receive the Total ,price
端口: Tianjin\Guangzhou\Shenzhen\Shanghai

付款条款

Documents Against Acceptance

Documents Against Payment

Letter of credit

Telegraphic transfer

MoneyGram

Western Union

Фотографии

    密码恢复
    要恢复您的密码,请在下面您的电子邮件地址框与您已注册请输入:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    发生了错误。请检查您的电子邮件地址,然后再试一次。
    Ваш новый пароль:

    名称为空


    Выберите страну доставки

    您还没有写消息

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    已发送您的消息!

    親密

    1
    Рынок B2B
    取消
      查看更多
        地區搜索
        全球
        Категории
          产品名称