incinerator with electricity generator

incinerator with electricity generator

原价: 1 350 000 USD
Ch’üan, 中国
生产能力:
5 设置 / 年
Ch’üan, 中国
公司
0086-595-22413855
tyler zeng
联系人姓名

基本信息

出生地 Fujian China (Mainland)
牌子的名字 Huangshi
模式的数量 FSL-30
Due to continuously booming of china economic and accelerating urbanization process,it is the time to use incinerator for garbage disposal,the garbage caloric value of quite a lot cities is up to 4180 5852KJ/kg, suitable for self-combustion. Generally the garbage caloric value high, the city is with strong economic and they have the bility and requirement for incinertor disposal. Now the technology and equipments of incinerator disposal had already developed to maturity, the disposal technical standard system and related rules had already set up perfact, including <garbage incinerator boiler> GB/T18750-2002, <engineering technical regulation of municipal solid waste incinerator disposal> CJJ90-2002, < standard for urban municipal solid waste incinerator disposal engineering project construction > [2001] no.213, <standard for pollution control on the municipal solid waste incinerator> GB 18485-2001; incinerator equipments developed to serialization and larger to meet different city for different municipal solid waste incinerator disposal. MOHURD issued <Municipal Solid Waste Management> on April 10th 2007 during continously issuing technical standard and regulation for solid waste incinerator disposal by Nation and the industry, it difinited for urban municipal solid waste incinerator disposal, make sure the incinerator disposal come to “decrement, innocuity, resource”. It is one of the primary task of all level government on “decrement, innocuity, resource” of urban municipal solid waste disposal for abidable development. The State Council presented in <The comprehensive work plan of energy conservation and emission reduction> that “All county level city above (including county level city) should set up garbage collection system, push garbage assorting system construction, recover the resouce from the garbage sufficiently, encourage garbage waste incinerator generate electricity and steam heat supply, slag fertilizer, slag brick making,etc., push urban and rural garbage innocent treatment, relize garbage decrement, resource and innocent”. Quanzhou City Licheng Huangshi Machinery Co.,Ltd research and development for muncipal solid waste incinerator disposal technology engineering for long term, this meet national energy resource and emission reduction policy, the result we got is a good selection for municipal solid waste disposal. Quanzhou City Licheng Huangshi Machinery Co.,Ltd research and development the municipal solid waste incinerator disposal equipment according to national policy for garbage integrated control technique, due to hard ignition, low burn-off rate, low combustion temperature, large consume assistant fuel, big investment, low adaptability for garbage, less quantity for disposal, out of date flue cleaning system and emission can not meet standard, etc., consider about china city and exist material, manufacture process and collect related technology of incinerator from national and international, we solved a lot of key problems, developed new garbage incinerator which suitable for china, according to different market for big, middle and small city, we manufactured garbage incinerator disposal system with series capacity 10 ton/day, 20 ton /day,35 ton/day, 50 ton/day, 75 ton/day, 100 ton/day, 150 ton/day and 200 ton/day. Technical data1.Deal Garbage capacity:( customer design) 2. Second combustion chamber outlet temperature:≥850 degree centrigrade 3. Flue cleaning system: design according to GB18485-2001 standard (or according to requirement of customer) 4.Burning rate≥99%, slag thermal lapse rate:≤5% 5. Incinerator outlet flue oxygen: 6 12% 6. Smoke stay in time in chamber:≥2 second (design value 3 4.5second) 7. Maturity control technology used for the incinerator running, with less instrument and patrol inspection to relize centrlized inspection and decentralized control for the garbage incinerator line and heat energy use and assistant system in the center control room by decentralized system control. The control is reliable and the producing is safe. 8. Use variable frenquency control for large power equipment such asexhaust fan, thus save the energy. 9. Use high temperature to vapour treat the production waste such as garbage leakage liquid. 10. With normal maintenance, it can run 300 days per year, the designed service term is 10 years. Referance documents and standard for our company design1. standard for urban municipal solid waste incinerator disposal engineering project construction 2.Industry standard of PRC <engineering technical regulation of municipal solid waste incinerator disposal>(CJJ90-2002,J184-2002) 3. National standard of PRC <standard for pollution control on the municipal solid waste incinerator>(GB18485-2001) 4. National standard of PRC <garbage incinerator boiler>(GB/T18750-2002) 5. <Emission standard for instrial enterprise noise at boundary> (GB12348-2008) 6. <Boiler steel structure specification>(JB/T1620-1993) 7. <Tubular air pre-heater fabricate specification>(JB/T1616-1993) 8. <Standard for checking and evaluating the quality of brickwork in industrial furnaces>(GB50309-82) 9. <Inspection and acceptance specification for installation work of air compressor,fan and pump>(GB50275-98) 10. < Code for construction and acceptance of low-voltage apparatus electric equipment installation engineering>(GB50254-96) 11. <Standard for hand over test of electric equipment installation engineering>(GB50150-91) 12. < Code for construction and acceptance of earthed device electric equipment installation engineering>(GB50170-92) 13. <Code for construction and acceptance of cable system electric equipment installation engineering>(GB50168-92) 14. < Code for construction and acceptance of electric equipment grounding>(GB50169-92)15. <Specifications of boiler painting and packing>(JB/T1615-1991) 16. <Specifications and acceptance for baghouse installation>(GB8471-96) 17. <Specification of CAD drawing for electric engineering>(GB/T18135-2000) 18. <Graphical symbols for diagram>(GB/T4728)

交货条款及包装

Packaging Detail: standard Delivery Detail: 6 months
端口: Xiamen

付款条款

Telegraphic transfer

Фотографии

    密码恢复
    要恢复您的密码,请在下面您的电子邮件地址框与您已注册请输入:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    发生了错误。请检查您的电子邮件地址,然后再试一次。
    Ваш новый пароль:

    名称为空


    Выберите страну доставки

    您还没有写消息

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    已发送您的消息!

    親密

    1
    Рынок B2B
    取消
      查看更多
        地區搜索
        全球
        Категории
          产品名称