FR-25 precision tube straightening machine,Metal r

FR-25 precision tube straightening machine,Metal r

原价: 1,00 USD
中国
生产能力:
100 片
Shelly Chou
联系人姓名

基本信息

FR-25 precision tube straightening machine,Metal roll forming machine Straightening Maximum diameter25mmStraightening the minimum diameter8mmRoller group number10 groupsTotal power3KWWeight800KGSize1100 * 900 * 950mm Straightening machine is straightening for metal bar, pipe, wire and other equipment. Straightening machine changes straightness by the straightening roller squeezing on the bar, etc, generally, there are two rows of straightening rollers and numbers different. There are also two roller straightening machines to straighten the material of different diameters, which rely on two roller (middle concave, hyperbolic roll) of. The main types has: pressure straightening machine, balance roller straightening machine, shoes roller straightening machine, rotating anti-straightening machine and so on Straightening machine and process equipment from Da Lang Fang Rong Machinery Factory, established in 2000, is a professional design, manufacturing, non-ferrous metals and ferrous metal tube, rod, row, and wire production line equipment manufacturers, the main products are straightening machine, drawing machine, chickened machines , rolling machine. Established the whole series lines equipment from drawing, straightening, polishing, until to the finished production according to customer requirements, the design concepts is to design, manufacturing equipment based on customer demand steel pipe making machine,metal pipe straightening machine,machinery manufacturer Quality Process Certifications: ISO 9000-2001 Quality guarantee: (1) Factory guarantees machinery well packed and testing qualified before shipment. (2) Factory guarantees all the goods are brand-new; no defects for the specifications or materials used. Twelve months quality warranty after Customer accepts the inspection for machinery’s trial operation. Claims Customer has rights to claims if there is quality problem caused by deficient manufacturing procedure, material or technical parameter, which doesn’t match the contract specified, factory will take responsibility for all related expenses caused. Penalty1, if contractual delivery day postponed due to factory’s reason except force-majeure, Customer has rights to get the compensation by portion from factory based on the followings: (1) factory has ten days grace period (2) Starting from the eleven days after delivery day postponed, every day’s penalty for factory is the whole contract amount’s 0.1%. 2, if contractual payment day postponed due to Part A’s reason except force-majeure, factory has rights to get the compensation by portion from Customer based on the followings: (1) Customer has ten days grace period (2) Starting from the eleven days after payment day postponed, every day’s penalty for Customer is the whole contract amount’s 0.1%. 3, the above mentioned penalty total amount can not be exceeding the whole contract amount’s 5%. Force Majeure: We factory shall not be held responsible for late delivery of the goods owing to generally recognized Force Majerue. Factory should notice Customer by oral immediately. 15 days later after force Majerue happens, and post customer the written proof documents from the related departments. If force manjerue keeps more than 60 days, Customer can cancel the contract. Factory should return the payment. Technical materials provide: Factory should provide the following data Each of Chinese / English version manual and matching tools enclosed for one machine. Contract amendment Any changes for the contract clauses, a written contract amendment must be signed by both parties. Arbitration If there is dispute during contract implementation, we should settle through negotiation made in the principle of fair cooperation. If not, the case under dispute shall be submitted for arbitration. Which has the same equally binding to both Parties, The cost of arbitration shall be borne by the losing party. During the arbitration, the non-dispute portion of the contract continues to implement except the arbitration part.

交货条款及包装

Packaging Detail: Standard Export Package Delivery Detail: 15-60days
端口: Shenzhen

付款条款

Telegraphic transfer

Фотографии

    密码恢复
    要恢复您的密码,请在下面您的电子邮件地址框与您已注册请输入:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    发生了错误。请检查您的电子邮件地址,然后再试一次。
    Ваш новый пароль:

    名称为空


    Выберите страну доставки

    您还没有写消息

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    已发送您的消息!

    親密

    1
    Рынок B2B
    取消
      查看更多
        地區搜索
        全球
        Категории
          产品名称