Conveyor Belt Repair Vulcanizer-I

Conveyor Belt Repair Vulcanizer-I

江英, 中国
江英, 中国
公司
86-510-86950888
kevin zhang
联系人姓名

基本信息

CGXBJ-1 Electrical Conveyor Belt Repair Machine divides as the high- voltage and low- voltage machines. (1) CBXBJ (LV) 1. Sulfide Pressure: 0.5Mpa; 2. Temperature: 145 ; 3. Rated Power: 2 KW; 4. Repairing maximum belt width: 1,400 mm. (2) CGXBJ (high voltage) parameter sheet Model CGXBJ-1CGXBJ-2CGXBJ-3Types of repairing transport belt Canvas, nylon, Belt with wire rope for transportingCanvas, nylon, Belt with wire rope for transportingCanvas, nylon, Belt with wire rope for transportingRepair transport belt width (mm) 650220065022006502200The maximum cut size of repairing belt (mm) 250×250250×600250×900Electric heating-Dimension (mm) 350×350350×700350×1000Vulcanizing temperature as Repairing at 145 Adjustable 0-200Adjustable 0-200Adjustable 0-200Total power (Kw) 1.911.911.91Voltage (V) 380380380Temperature difference of working Electrical plate surface () ±3±3±3Sulfide pressure (MPa) 0.80.80.8Time of heating from normal temperature to curing temperature (mins) 303030 Installation: 1.Please move the repair machine to the repair location; 2.Please fill the raw rubber to the broken part. (The filling raw rubber part in the vulcanization technics can be taken as reference, or our technical workers demonstrate it as adjusting.) 3. Please put the down machine frame rightly aiming at the broken part, meanwhile, put the hydraulic pressure plate and the lower heating plate under the broken part. 4.Please put the upper heating plate on the broken part, and lay up the heat insulation plate, and then install the machine frame.( remark: CGXBJ low voltage series machines are integrative machines. 5.Install the screw and screw down. 6.Please connect power with electrical control box by primary cable, and separately connect upper heating plate with electrical control box, and the lower heating plate with electrical control box by secondary cable, meanwhile, please separately connect upper heating plate and electrical control box, lower heating plate and electrical control box with temperature-measure components. Please pay attention to the corresponding electrical control box as connection. 7.Please connect hydraulic plate and pressure-test pump with high pressure tube, and then start the electrical control box, meanwhile, and affuse water to the condition of vulcanizing pressure.

交货条款及包装

Packaging Detail: wooden case Delivery Detail: 4 working days
端口: Shanghai
Фотографии

    密码恢复
    要恢复您的密码,请在下面您的电子邮件地址框与您已注册请输入:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    发生了错误。请检查您的电子邮件地址,然后再试一次。
    Ваш новый пароль:

    名称为空


    Выберите страну доставки

    您还没有写消息

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    已发送您的消息!

    親密

    1
    Рынок B2B
    取消
      查看更多
        地區搜索
        全球
        Категории
          产品名称