app roofing membrane

app roofing membrane

广州市, 中国
广州市, 中国
公司
86-0-15920172205
Terri Peng
联系人姓名

基本信息

Category:APP Modified Bitumen Waterproof Membrane finished SandDescription:DY-APP Modified Bitumen Waterproof Membrane materials using polyester reinforcement for waterproofing,it's made from polyester felt as its reinforcement featuring high strength,elongation and corrision resistance, APP,APAO as its modifier for meeting the torched-on applications, it shall be covered with polyethylene membrane(PE),aluminium foil, colorful sand or mineral granule on its top face and polyethylene membrane(PE)coated on its under face. This series of membrane is designed for the waterproofing of underground construction such as tunnel, subway, basement ,roofs and pools etc. 1.The special formulation of fire enables the membrane to be applied directly with primer. This application is named as "Torched on application". APP Membrane installation procedure:1.Base processing:the base surface must be clean,solid,level,dry;no grit,rift and loosing dust. For a large recess,fill it with cement mortar and then level it. Remove the protrusion and clean dust.If working on base slab or lateral face,water lowering should be done.2. Painting primer:before laying the membrane,clean the dust on the surface of concrete base with dust catcher or dust-blower;then paint entirely with treatment agent of DY primer for waterproofing(for purpose of dust consolidation and high adhesive effect).3.Heat to melt: place membrane correctly, fire torch, heat the membrane with base entirely, when the surface of the membrane is black and bright with a fusion layer, apply the membrane and press it into a solid and flat state.Before the membrane is cool, seal the edge of joint by float.4.Requirements for lapping: There should be less than 3 layers of lapping, with the joint seams appearing as"T" type,avoid 4 layers of lapping.The width of longitudinal lapping is between 50 and 80mm,and of end-lap joint 100mm.5.After application3. Package and transportation:1.Membranes should be stored under dry and ventilated conditions.2. Different types of membranes must be piled separately.3.Under usual condition, storage period is one year since production date.4.Membrane roll should be put vertically during transportation. It should be kept away from sunshine and rainwater.4. Requirements for surroundings:1.The base should be dry and clean. Do not work in the rainy or snowy day.2.Do not work under heavy wind(above 5 grade)3.Unsuitable for construction below 0°C4.If it is rain or snow in the process of construction, protective measure to the laid membrane is must.5. Technical propertyAPP Waterproof Membarne Reinforced basePYGTypeIIIIIIContent of soluble substances(g/m2)≥2mm13003mm21004mm2900Water impermeabilityPressure (Map)0.30.20.3Retention time (min)Impermeability within 30 minHeat resistance °C9010590105Tensile strengthN/50mm≥Longitudinal450800350500Transverse250500Elongation at break %≥Longitudinal30%40%--------------TransverseTear strength N≥Longitudinal250350250350Transverse170200Low temperature flexibility°C-18-25-18-25

交货条款及包装

Packaging Detail: Packing details: package to rolls with strips. Delivery Detail: 3 to 5 days for one 20 feet container after received 30% deposit

付款条款

Letter of credit

Telegraphic transfer

Western Union

Фотографии

    密码恢复
    要恢复您的密码,请在下面您的电子邮件地址框与您已注册请输入:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    发生了错误。请检查您的电子邮件地址,然后再试一次。
    Ваш новый пароль:

    名称为空


    Выберите страну доставки

    您还没有写消息

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    已发送您的消息!

    親密

    1
    Рынок B2B
    取消
      查看更多
        地區搜索
        全球
        Категории
          产品名称