2轴油罐半拖车

2轴油罐半拖车

中国
生产能力:
5000 单元 / 年
Dennis Ng
联系人姓名

基本信息

类型 半拖车
材料 钢铁
oil tank semi trailerTechnical DataWeight Rating (kgs) Tare Weight 12000 Pay Load 38000 Total Weight 50000 Dimension Trailer Overall Length 12480 Overall Width 2480 Overall Height 3800 Wheelbase 7000+1360+1360 TankTank Dimension Length12100 Max dia 2490 Min dia 2070 Total Volumem3 46 Valid Volumem3 45 Drift Diameterinch System 4 Outlet 4 Material Q235A/6mm End plate Q235A/6mm, by punching6mm/Q235A Spurn water Q235A/5mm, 20 inch manhole6mm/Q235A Parts for TankManhole cover 3 sets of 400mm/Q235 manhole fixed on top of Tank, with breather valve Unloading valve 2 sets of DN80 fixed at button of Tank Pipeline at button of tank 4seamless steel tube/Q235 Labeling system Oil Type Indication Anti-static electricity system pulling, wire carrier, sheet copper (7 sheet-standard layout) Other PartsLadder 1 unit at front of Tank Guard on top of Tank Zinc galvanized guard net Oil hose box Circular single hole tube, 1 unit on each side Oil hose 2 unit, 3 x 6m size in black rubber Side guard cross bar-structure Rear button guard Fixed type Work tank deck Box type Fire extinguisher box 2 units at the back of each side Mud guard Steel structure in trapezoid form Lights and wire 24V, 7 coils with lights for parking, reverse, instruction, head lamp and end lamp ChassisMain Beams Heavy duty and extra durability designed; Opting for high tensile steel Q345B,welded by automatic Submerged-Arc processes Axle Three units of L1 (band)12 ton axle Landing Gear Two Speed Manual Operation King Pin One unit of 3.5SAE standard Jost bolt-in king pin Suspension SAF (band) German style mechanical Tri-axle suspension with 11mm x 100mm 13- leaf springs Pneumatic Braking System A system with emergency brake and parking brake; Dual line ,air brake, piggyback spring on all axles; Two units of WABCO RE 6 relay valve; six units of T30/30 spring chamber; two units of 40L air tank ; two units of standard copper air-connector. Wheel rim twelve units of 8.25.00R22.5rim Tire twelve units of 11R22.5 tubeless tyre Painting Sand blasting processing on rust cleaning One coats of anticorrosive Two coats of finish urethane paint Colour as customer choice

交货条款及包装

Packaging Detail: one units loaded into a 45F HQ Delivery Detail: 30days after received down payment
端口: shenzhen

付款条款

Letter of credit

Telegraphic transfer

Фотографии

    密码恢复
    要恢复您的密码,请在下面您的电子邮件地址框与您已注册请输入:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    发生了错误。请检查您的电子邮件地址,然后再试一次。
    Ваш новый пароль:

    名称为空


    Выберите страну доставки

    您还没有写消息

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    已发送您的消息!

    親密

    1
    Рынок B2B
    取消
      查看更多
        地區搜索
        全球
        Категории
          产品名称