Item Unit SC200/200 Rated load KG 2000/2000 Rated lifting speed m/min 33 Max lifting height m 150 Cage size m*m 3*1.3 Cage height m 2.4 Starting current A 270 Working current A 70 Power consumption KVA 13*3 Motor power KW 11*3/11*3 Mast section weight Kg 140 Weight for 150m height t 20 Mast section size m*m*m 1.508*6.50*6.50 SC200/200 construction elevator, the use of rack and pinion engagement, external, third drive, the rated load of 2 tons, lifting height of 150 meters rated construction lifts, make a little change to 2 tons into a single cage construction hoist