Main ingredients: acrylate polymer, pigments, fillers, additives and water. Basic requirements: first-line treatment level, strong, ash, no lose material. If there is uneven and crack, can use first cement mortar trentment paving repair. Basic content should be less than 8%. Floor drain pipe should remove rust and roots and ash scale. A: the construction methods, besmear: according to 0.3 kg/m2 consumption will "fang" pour water FSG500 solid container, mix water 30% in waterproof coating, 1-2 times grass-roots, permeability and close-grained. B, can besmear to brush roller coated, also can use the putty scraper scraping coat. C: first, the construction sequence (apart from the ground elevation of besmear of 0.3 meters), floor drain, pipe, followed by plane. 2-3 times besmear. D, in the first time after besmear table dry (grabbled unconsciously), but the sticky coating. The second time brushing direction with the first time brushing direction perpendicular. The third time brushing direction with the second time brushing direction perpendicular. Construction: the construction environment temperature and solidification process of not less than 10 degrees Celsius temperature. Paint film thickness coated membrane thickness, 1mm: every times, besmear 2mm 0.6-0.8 mm film thickness mm. The waterproof coating thickness, > 1.5 mm advisable, Floor moistureproof processing, coating thickness > 1mm advisable. Consumption quantity: theory, 1 square meters (twice), besmear need 1.5 kg FSG500 "solid" fang water. Because of the actual amount of flatness, coating thickness and different and different construction methods. Open the cover not use up, must seal storage, prevent curing scrap. Execution standard: technical standard: T864-2008 JC /, Environmental standards: GB50325-2001. Storage and transportation, storage at room temperature not less than 5 ° c, ventilation, avoid light and dry place, for a period of 24 months. Don't burn, non-toxic products can be stored in accordance with the dangerous goods transport rules.