Конвейер ремонта Вулканизатор-I

Конвейер ремонта Вулканизатор-I

Jiangying, Китай
Компания
86-510-86950888
kevin zhang
Контактное лицо

Основные данные

CGXBJ-1 Electrical Conveyor Belt Repair Machine divides as the high- voltage and low- voltage machines. (1) CBXBJ (LV) 1. Sulfide Pressure: 0.5Mpa; 2. Temperature: 145 ; 3. Rated Power: 2 KW; 4. Repairing maximum belt width: 1,400 mm. (2) CGXBJ (high voltage) parameter sheet Model CGXBJ-1CGXBJ-2CGXBJ-3Types of repairing transport belt Canvas, nylon, Belt with wire rope for transportingCanvas, nylon, Belt with wire rope for transportingCanvas, nylon, Belt with wire rope for transportingRepair transport belt width (mm) 650220065022006502200The maximum cut size of repairing belt (mm) 250×250250×600250×900Electric heating-Dimension (mm) 350×350350×700350×1000Vulcanizing temperature as Repairing at 145 Adjustable 0-200Adjustable 0-200Adjustable 0-200Total power (Kw) 1.911.911.91Voltage (V) 380380380Temperature difference of working Electrical plate surface () ±3±3±3Sulfide pressure (MPa) 0.80.80.8Time of heating from normal temperature to curing temperature (mins) 303030 Installation: 1.Please move the repair machine to the repair location; 2.Please fill the raw rubber to the broken part. (The filling raw rubber part in the vulcanization technics can be taken as reference, or our technical workers demonstrate it as adjusting.) 3. Please put the down machine frame rightly aiming at the broken part, meanwhile, put the hydraulic pressure plate and the lower heating plate under the broken part. 4.Please put the upper heating plate on the broken part, and lay up the heat insulation plate, and then install the machine frame.( remark: CGXBJ low voltage series machines are integrative machines. 5.Install the screw and screw down. 6.Please connect power with electrical control box by primary cable, and separately connect upper heating plate with electrical control box, and the lower heating plate with electrical control box by secondary cable, meanwhile, please separately connect upper heating plate and electrical control box, lower heating plate and electrical control box with temperature-measure components. Please pay attention to the corresponding electrical control box as connection. 7.Please connect hydraulic plate and pressure-test pump with high pressure tube, and then start the electrical control box, meanwhile, and affuse water to the condition of vulcanizing pressure.

Условия поставки и упаковка

Packaging Detail: wooden case Delivery Detail: 4 working days
Порт: Shanghai
Фотографии

    Восстановление пароля
    Для восстановления пароля, введите пожалуйста ниже емаил, на который производилась регистрация:
    Код для сброса пароля был выслан на указанный Вами Email
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    Произошла ошибка. Пожалуйста, проверьте введенные Емаил и повторите попытку.
    Ваш новый пароль:

    Имя не заполнено


    Выберите страну доставки

    Вы не написали сообщение

    Нажимая на кнопку "Отправить" Вы даете нам свое согласие на использование указанных Вами здесь данных для обработки Вашего запроса. Передача данных третьим лицам исключена.

    Ваше сообщение отправлено!

    Закрыть

    1
    Рынок B2B
    Сбросить Закрыть
      Показать все свернуть
        Регион поиска
        По всему миру
        Категории
          Наименование позиций