ГПД-2/4/6 высокая температура и высокое давление струи

ГПД-2/4/6 высокая температура и высокое давление струи

Уси, Китай
Объем производства:
5 Набор / Месяц
Уси, Китай
Компания
0086-0-13806175619
JOHN CHEN
Контактное лицо

Основные данные

Место происхождения Jiangsu China (Mainland)
Бренд DONGZHOU BRAND
Номер Модели DF252
PURPOSE The machine is used for high-temperature,high-pressure disperse dyeing of filament polyester,mercerized and embroidery thread,artificial silk,synthetic fiber,as well as skein dyeing. MAIN STRUCTURE AND COMPOSITION All the parts contacting dye liquor are made od 0Cr18Ni10Ti stainless steel.Vat body and cover are cover are locked with lockong ring and air pressure seal device.It is easy,flexible and reliable to open cover.The machine employs advanced high-performance homemade high-head dyeing pump without air turbidity.Under high temperature and high pressure sufficient water can be supplied for uniformly dyeing without stains and piling.With use of worm gearing the machine has the features of small volume ,light weight ,self-locking,etc.Dye liquor circulating form:Dye liquor in vessel enters water division boxes and jet tubes through circulating pump to perform timing spray dyeing of skein and return,thus repeating circulation.Heating form:Use steam to provide direct and indirect heating.Electrical unit is controlled automatically with interval,positive and negative regulation.It is convenient to operate.MAIN PROCESSING PARAMETERS Number of jet tubes:2-6 pcsEfficient length of jet tube:1500mmCapacity of yarn,yarn tape hung on each jet tube:15kg Capacity of shoelaces on each tube:About 2500mBath ratio:1:8-1:15Working temperature:=140°CWorking pressure:=3kgSpeed of circulating pump:1400r/minHead of circulating pump:12mFlow of circulating pump: 120m3/hMotor of circulating pump:Counting according to 2kw per tubeIMPORTANT POINTS ABOUT SAFETY Enclosed electrical control box can't be opened during operation.Never make adjustment and oil filling during operation.Never make living maintenance.INSTALLATION The machine as an integrate type needs a 12cm thick even cement foudation.Particularly when installing the machine should be keep leveling.Water pump is firmly located with expansion screws. USER-PREPARED PARTS All the pipes except water inlet valve,drain discharge valve,heating valve and cooling valve.When pneumatic air pressure seal device is used,an air compressor should be fitted.

Условия поставки и упаковка

Packaging Detail: AS USUAL OR ACCORDING TO THE REQUIREMENT OF THE BUYER.. Delivery Detail: within 45 working days after received the deposit(30%of amount)
Порт: shanghai

Условия оплаты

Документы за наличный расчёт

Аккредитив

Электронный перевод

Фотографии

    Восстановление пароля
    Для восстановления пароля, введите пожалуйста ниже емаил, на который производилась регистрация:
    Код для сброса пароля был выслан на указанный Вами Email
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    Произошла ошибка. Пожалуйста, проверьте введенные Емаил и повторите попытку.
    Ваш новый пароль:

    Имя не заполнено


    Выберите страну доставки

    Вы не написали сообщение

    Нажимая на кнопку "Отправить" Вы даете нам свое согласие на использование указанных Вами здесь данных для обработки Вашего запроса. Передача данных третьим лицам исключена.

    Ваше сообщение отправлено!

    Закрыть

    1
    Рынок B2B
    Сбросить Закрыть
      Показать все свернуть
        Регион поиска
        По всему миру
        Категории
          Наименование позиций