GIV15A220A электромагнитный клапан

GIV15A220A электромагнитный клапан

ориг. цена: 15,00 USD
Пекин, Китай
Объем производства:
10000 Штука / Месяц
Пекин, Китай
Анонимный
86-010-51655362
13701089084
Peter Lee
Контактное лицо

Основные данные

Присоединительный размер 1/2''
Место происхождения Beijing China (Mainland)
Номер Модели GIV10A220A
Бренд Green Island
Стандартные / Нестандартные Стандартные
Конструкция Запорные клапаны
Давление Низкое давление
Вид энергии Соленоид
Температура среды Умеренная температура
Среда Газ
APPLICATION: IV… A series class A gas valves are used for control and regulation of gaseous fluids in gas power burners, atmospheric gas boilers, melting furnaces, incinerators and other gas consuming ppliances. Technical Data: Supply voltage:< 230/120Vac, 50/60 Hz,±10% Ambient temperature:<15°C - 60°C Maximum operating pressure: <200mbar Enclosure:< IP54 Opening time:<1 S Closing time:<1 S Electronic connection: DIN connection Maximum working frequency:< 20 per minute Number of cycles:> 200,000 Installation: Take care that installer is a trained experienced service man. *Turn off gas supply before starting installation. *Disconnect power supply to prevent electrical shock and/or equipment damage. Mounting position: *The gas valve can be mounted plus or minus 90 degrees from the vertical. Mounting location: *The distance between the gas valve and the wall/ground, must be at least 30 cm. Main gas connection threaded valves: *Take care that dirt shouldn’t enter the gas valve during handling. *Ensure the gas flows in the same direction as the arrow on the housing of the gas valve. *Use a sound taper fitting with thread according to ISO7--1(BS 21, DIN 2999) or a piece of new, properly reamed pipe, free from swarf. *Do not thread or tighten the pipe or pipe fitting too far. Otherwise valve distortion and malfunction could result. *Apply a moderate amount of good quality thread compound to the pipe or fitting only, leaving the two end threads bare. PTFE tape may be used as an alternative. *In order to tighten the pipe in the valve, do not use the actuator as a lever but use a suitable wrench operating on the wrench bosses. Tightness test after installation: *Paint all pipe connections and gaskets with a strong soap and water solution. *Start the appliance and check for bubbles. If a leak is found in a pipe connection, remake the joint. Ordering information: Model ConnectionVoltageSize(HxLXW)Pressure Switch PositionGIV10A220A3/8''230105x70x67NoGIV10A110A3/8''110105x70x67NoGIV15A220A1/2'230105x70x67NoGIV15A110A1/2'110105x70x67NoGIV20A220A3/4''230120x90x77YesGIV25A220A1''110120x90x77Yes CAUTION: The oiland body of gas valve will be heated after long time using. To be carefully to contact the gas valve with your hand at adjustment or maintenance.

Условия поставки и упаковка

Packaging Detail: Packaged in cardboard boxes Delivery Detail: 1 week
Порт: Tianjin

Условия оплаты

Аккредитив

Электронный перевод

Фотографии

    Восстановление пароля
    Для восстановления пароля, введите пожалуйста ниже емаил, на который производилась регистрация:
    Код для сброса пароля был выслан на указанный Вами Email
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    Произошла ошибка. Пожалуйста, проверьте введенные Емаил и повторите попытку.
    Ваш новый пароль:

    Имя не заполнено


    Выберите страну доставки

    Вы не написали сообщение

    Нажимая на кнопку "Отправить" Вы даете нам свое согласие на использование указанных Вами здесь данных для обработки Вашего запроса. Передача данных третьим лицам исключена.

    Ваше сообщение отправлено!

    Закрыть

    1
    Рынок B2B
    Сбросить Закрыть
      Показать все свернуть
        Регион поиска
        По всему миру
        Категории
          Наименование позиций