CDS-1 Инновации электрика лабораторное оборудование

CDS-1 Инновации электрика лабораторное оборудование

ориг. цена: 3 800 USD
Ханчжоу, Китай
Ханчжоу, Китай
Компания
86-571-88040029
James Chu
Контактное лицо

Основные данные

CDS-1 Innovation electrician laboratory equipment Type CDS - 1 electric experimental device is in innovative company type GDDS electrical based on experimental device, With the advantages of foreign products, after innovation, The successful domestic first generation innovative experimental device electrician innovation. This device adopts "innovation, virtual real combining,” The new concept of network management, Instead of the traditional "verify" concept, To cultivate innovative talents need. 1. Main technical characteristics (1). To cultivate students' innovation consciousness, In order to design, comprehensive and innovative experiment replace the current experiment. Experimental device provide necessary electrical instruments, all kinds of experiments(According to the school can be embedded digital oscilloscopes, LCD display), Experiments are the smallest parts, Such as resistors, capacitors, and inductors, operational amplifiers, etc. Even the past double mouth network, controlled source to students themselves, Experimental projects are designed, The simulation and the innovative. This greatly improves the students' innovative consciousness and innovative capability of innovative technology, become the new generation of talents. (2). virtual real combining, to cultivate students' innovative consciousness and innovative ability. The company development of virtual experiment software, Establish a common electrical experimental components, Measuring meter model, Students can be quickly and easily select experiment devices and components Parameters, Calls for measuring and can be edited range, can fleetly experiment circuit, Finally in the form of the measurement data shows, waveform, etc. And can be stored in the computer. So students can finish design Integrated innovation experiment method of the virtual, Then with the really components constructing experimental line complete their ideas. (3). The network management of opening experimental teaching mode 1).All of the whole school applied in laboratory management 2).Through the system Settings to achieve unified management of the laboratory of different subjects 3).A database system composed by three procedures: Teacher machine program, Students machine program, The identity verification procedures and SQL database. 4). The master server: pack teacher machine program and SQL database 5). Teacher machine: Pack teacher machine program, Can complete: system setup and personnel registration, the design of experiments (including experiment documents), automatic scoring exam preparation, experimental arrangement, experimental score, scores query ,log management, With the student machine dialogue, Processing Video files, monitoring Students of the machine experiment and power. 6). Students machine: pack students machine program can complete machine process experiment data acquisition, Experimental download file and due, automatic test scores,scores query, with dialogue, video viewing teacher machine. 7). Ext:The identity verification procedures loading: verified identity, Experimental arrangements inquires. 8). Network: On campus open, Add in the existing school network related experimental booking, Experimental file query, Submit a report, Experimental results inquiries programs Only by the network management, can we truly achieve the opening experiment teaching mode 4.Safety protection method implements the recent National standards GB4706.1,GB6829,GB13955 and the latest national standards and international standards GB4793.1-2007/IEC31010-1:2001 <<The measurement and control and lab safety requirements of electrical equipment>> To implement the open, safety protection must first 5.The hardware of the most vulnerable meter is damaged This device configuration the company national patent instrumentation, With strong overload ability, In any mistake, and would not be damaged by wiring under the meter, Within the ammeter is close to zero impedance circuit, will not affect the original state, The accuracy and precision of basic experimental consistent to 0.5.Implement measure true RMS exchange table, Adaptability to wave, Reach 20KHZ frequency range, Have strong electromagnetic interference ability, Under the strong electromagnetic interference in digital stability 6. Power is flowing, short-circuit, and overload protection 2. Experimental projects Complete design and comprehensive experimental projects without restriction. Experimental platform size: 1700mm*750mm*1500mm

Условия поставки и упаковка

Packaging Detail: Packed in wooden cases Delivery Detail: 20 days within receipt of 30% deposit
Порт: shanghai/ningbo

Условия оплаты

Аккредитив

Электронный перевод

Фотографии

    Восстановление пароля
    Для восстановления пароля, введите пожалуйста ниже емаил, на который производилась регистрация:
    Код для сброса пароля был выслан на указанный Вами Email
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    Произошла ошибка. Пожалуйста, проверьте введенные Емаил и повторите попытку.
    Ваш новый пароль:

    Имя не заполнено


    Выберите страну доставки

    Вы не написали сообщение

    Нажимая на кнопку "Отправить" Вы даете нам свое согласие на использование указанных Вами здесь данных для обработки Вашего запроса. Передача данных третьим лицам исключена.

    Ваше сообщение отправлено!

    Закрыть

    1
    Рынок B2B
    Сбросить Закрыть
      Показать все свернуть
        Регион поиска
        По всему миру
        Категории
          Наименование позиций