3PE клей антикоррозионная стальных труб

3PE клей антикоррозионная стальных труб

Гуанчжоу, Китай
Объем производства:
60 Тонна / Год
Гуанчжоу, Китай
Компания
86-020-82266153
Erica Xiao
Контактное лицо

Основные данные

Место происхождения Guangdong China (Mainland)
Использование Construction
Бренд LUSHAN
Номер Модели L-5R(LC)
Классификация Клей-расплав
3PE anti corrosion steel pipe adhesive L-5R Lushan ® L-5R is a polyolefin based adhesive polymer containing anhydride functionality.It is in pellet form and designed for use in 3-layer pipe coating systems in conjunction with an epoxy primer and a thick polyethylene top-coat.Together with EJ-1 ( compounded top coat), L-5R shows highly adjusted pipe coating system available for all pipe coating specification including DIN30670,CSA-Z245.21. Processing Temperature Item Preheating Zone Middle Zone Transition Zone Mould Head Melting Temperature Processing Temperature°C 150 180 190 220 190 220 200 220 190 220 The actual processing temperature depends on the type of equipment, the above-mentioned conditions for reference. Packages and Storage 25kgs Paper-plastic bag.Store in a dry, cool and ventilated environment; avoid direct exposure to water and strong light.Shelf life: One year. L-5R (LC) Item Test Standard Unit Typical value Melting Index ASTM D1238 g/10min 2.5 Density ASTM D792 g/cm3 0.933 Tensile Strength ASTM D638 MPa 21 Elongation at Break ASTM D638 % 940 Melting Point ASTM D2117 °C 128 Vicat Softening Point ASTM D1525 °C 108 Brittleness Temperature ASTM D746 °C -70 Peeling Strength SY/T0413-2002 N/cm 20+5°C ≥150 50+5°C ≥120 60+5°C ≥80 80+5°C / These are typical properties and not intended as specification. Famous external projects we served:Project NameDiameter(mm)Length(km)DateIndia Reliance Natural gas pipeline Project φ12191200.002006Sino-Russia Oil Transportation Project φ32530.002006.12Colombia Pipeline Project φ355.618.002006.10Brazil Gas Pipeline Project φ114.314.702006.7Singapore Pipeline Project φ406.42.2582006.6Brazil Gas Pipeline Project φ323.9122.642005.7φ168.33.576Malaysia Pipeline Project φ406.4101.002006.6Sino-Kazakhstan crude oil pipeline φ813560.002004-2005 Romania Gas Pipeline Project φ430-630130.002002Iraq Oil Transportation Project φ168-406400.002002Iraq Oil Transportation Project φ325-711134.002000.5-8United Arab Emirates Oil Transportation Project φ168-61050.002001.1

Условия поставки и упаковка

Packaging Detail: 3PE anti corrosion steel pipe adhesive1.25kgs Paper-plastic bag.2.Store in a dry,cool and ventilated environment;3.avoid direct exposure to water and strong light.4.Shelf life:One year5.as customers'options. Delivery Detail: Less than 15/20/25/30/40/50/60 days according to the quantity.
Порт: Huangpu

Условия оплаты

Аккредитив

Электронный перевод

Фотографии

    Восстановление пароля
    Для восстановления пароля, введите пожалуйста ниже емаил, на который производилась регистрация:
    Код для сброса пароля был выслан на указанный Вами Email
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    Произошла ошибка. Пожалуйста, проверьте введенные Емаил и повторите попытку.
    Ваш новый пароль:

    Имя не заполнено


    Выберите страну доставки

    Вы не написали сообщение

    Нажимая на кнопку "Отправить" Вы даете нам свое согласие на использование указанных Вами здесь данных для обработки Вашего запроса. Передача данных третьим лицам исключена.

    Ваше сообщение отправлено!

    Закрыть

    1
    Рынок B2B
    Сбросить Закрыть
      Показать все свернуть
        Регион поиска
        По всему миру
        Категории
          Наименование позиций