Roof Insulation Board

Roof Insulation Board

Hangzhou, China
Hangzhou, China
Company
86-571-88075683
Shine Jin
Contact person

Basic Information

1.CE approved roof insulation panel XPS is an extruded polystyrene insulation manufactured through a plastic extrusion process. The resulting boards are almost 100% closed cell, strong, highly moisture resistant and easy to cut and shape.XPS is particularly indicated for places where a high mechanic resistance is required. Its resistance to water and compression make it the ideal insulation solution for extreme conditions. Moreover, it is very easy to install and offers a high performance thermal insulation for your building.2.Technical data sheet of the XPS foam board:DensityKg/m338 40Thermal conductivity, 90 days, 10°CW/mK0.027 0.03Compressive strength at 10% deflection or yield, (vertical)kPa≥300Tensile strengthkPa≥300Water absorptionVol-%<=1.00%CapillaritynilnilCoefficient of linear thermal expansionmm/mK0.07Temperature limits°C-50°C, +75°C 3.installation procedure of the roofing insulation 1-----finish layer2-----XPS foam board3-----waterproof layer4-----clean surface or new concrete layer to make it flat and clean enough.5-----exising concrete baseSeep 1, Existing concrete bases should be mechanically prepared removing all traces of existing finishes, contamination, etc., to expose a clean surface. Step 2. install the waterproof layer.Step 3 The XPS foam Board should be bedded onto the waterproof layer using a flexible cement-based adhesive to avoid the movements of the XPS board in the next phrase. Since there is almost no deformation, it is not necessary to stay the joints for expansion. When meet the sudden higher or lower place, the XPS foam board can be cut accordingly.Step 4 install the GEO-textile sheet between the finisher layer and the insulation board. The purpose is to separate and protect the insulation board. While for XPS foam board, because it has stable performance and anti-aging, this step can be omitted.Step 5. Install the finish layer. For walking roof, the finish layer normally is made of fixture embedded into cement mortar. And for no-walking roof, the finish layer is normally made of Gravel, cement brick, cement tile etc.

Delivery terms and packaging

Packaging Detail: palstic bag Delivery Detail: 10 days after received the deposite
Port: Ningbo

Payment term

Letter of credit

Telegraphic transfer

Фотографии

    Password recovery
    To recover your password, please enter in the box below your email address with which you have registered:
    The password reset code has been sent to your Email.
    Код уже был отправлен Вам ранее.
    Вы можете ввести его в поле выше, или получить новый код через сек.
    An error has occurred. Please check your e-mail address and try again.
    Ваш новый пароль:

    Name is empty


    Выберите страну доставки

    You have not written a message

    By clicking on the "Send" button, you agree that your data will be used to process your request. Further information and revocation instructions can be found in the data protection declaration.

    Your message has been sent!

    Close

    1
    Рынок B2B
    Cancel Close
      Show more close
        Area search
        Worldwide
        Категории
          Product