Place of Origin |
Shandong China (Mainland) |
Brand Name |
yongli |
(1) cutter suction dredger broad range of applications in operations in the rivers and lakes for the dredging, channel excavation, hydraulic fill create land. In exceptional circumstances a cutter suction dredger cutter installed on the high-power devices, can be excavated without blasting rocks such as basalt and limestone strata. (2) cutter suction dredger high efficiency, large output, pump from the well. Large-scale production of a cutter suction dredger of up to several thousand cubic meters per hour; the sand, or crushed rock material to rely on a strong driving force through the mud pumps and mud pipeline, pumping out a few kilometers outside. (3) cutter suction dredger is simple, easy to control. Stern of the dredger on the steel piles trolley position and stepping, the use of measuring cable cutter arm 2 Trench 2 measured with the fixed anchor, by hinge traction, hatchback swing cutter cut sediment materials, in the must work under the control of the swing angle, the twisting movement of the material, after losing to the accumulation of mud tube pump field. Step dredger piles alternately by the two campaigns move forward. (4) Large cutter suction dredger with a self-propulsion system. Migration can be self-propulsion in place. Dredgers are mostly small and medium sized non-self-propulsion system and rely on the tug towing. Dredger can be designed for small and medium constructed assembled by land transport to the scene immediately after use by the assembly. (5) The cutter suction dredger the economy is good. Excavation and transportation of materials once completed, no other boat with the ship, moving several times. Project cost is relatively low Item Parameter Remarks Total Length 38.2m Hull Length 24.0m Hull Depth 1.8m Hull Width 6.0m Main Power 720KW JICHAI POWER 12V190 Pump power Auxiliary Power 24KW Sand Pump 16/14inch SHIJIAZHUANG Pump Dia 350mm Pipe Dia 425mm Water Flow 2600m³/h Discharge Distance 1500m Output 450m³ Dry output Working Weight 140 Spud 450mm Two pieces 16m/piece Hydraulic Winch 3SET Navigation Ability No Operation System PLC Control System and Hydraulic system (the most advanced now,German electronic electronic component , OMRON ) Spare parts Tools for diseloil sealwelders ect 70 items Lead time 100 working days .